Laserfiche WebLink
1 ra <br /> . Mr Harlan Knoll <br /> April 24, 2000 <br /> Page 4 <br /> Thank you for your review of this work pian and overall assistance on the project Please <br /> provide written approval and/or comments so that the cost to implement the work pian <br /> can be pre-approved by the UST Cleanup Fund. If you have questions or need any <br /> additional information,please call me at (916) 354-3250 <br /> Sincerely, r� <br /> RAMAGE ENVIRONMENTAL f �R GEaI pC <br /> qr%-A -Y1 <br /> * . 5858 �r <br /> Joseph Ramage, R G NoNOUp. 30 ox <br /> Project Manager <br /> CAi.�F <br /> Attachments Table 1 Cumulative Analytical Results, Soil <br /> Figure 1 Site Plan and Proposed CPT Boring Location <br /> Figure 2 Cross-Section A-A' <br /> • Figure 3 Cross-Section B-B' <br /> CC Mr Al Vigil—San Joaquin Catholic Cemetery <br /> Mr Marty Hartzell—RWQCB, Central Valley Region <br /> Mr Mark Naugle—ENSR Consultants <br />