My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002813
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
719
>
3500 - Local Oversight Program
>
PR0545262
>
ARCHIVED REPORTS_XR0002813
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2020 7:45:24 PM
Creation date
2/3/2020 10:29:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002813
RECORD_ID
PR0545262
PE
3528
FACILITY_ID
FA0009940
FACILITY_NAME
SAN JOAQUIN CATHOLIC CEMETERY
STREET_NUMBER
719
Direction
E
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
12720002
CURRENT_STATUS
02
SITE_LOCATION
719 E HARDING WAY
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1.0 INTRODUCTION <br /> Ramage Environmental has prepared this Groundwater Monitoring Report for the Third Quarter <br /> of 1998, as requested by Mr Al Vigil of the San Joaquin Catholic Cemetery The scope of work <br /> was reviewed and supervised by Mr Harlin Knoll of the San Joaquin County Public Health <br /> Services Environmental Health Division (PHSIEHD) <br /> 1 1 Site Description <br /> The subject property is an operating cemetery located on the northeast corner of Harding Way <br /> and Cemetery Lane in the city of Stockton (San Joaquin County), California (Figure 1 - Site <br /> Location Map) The project site is located on the east side of the mausoleum budding (Figure 2 <br /> —Site Plan) <br /> 1.2 Previous Work <br /> To date, two underground gasoline storage tanks (UST) and associated pumping equipment <br /> have been removed from the site Based on evidence of impacted sod and groundwater <br /> beneath the site, a total of seven groundwater monitoring wells, two sod vapor extraction wells <br /> and two soil vapor extraction well nests have been installed No active sod or groundwater <br /> remediation has been conducted at the site <br /> Groundwater has been sampled at the site since August 1990 A dramatic rise in groundwater <br /> elevation since well installation in the early 1990s has resulted in groundwater table levels above <br /> the screened interval of the five groundwater monitoring wells The rise in groundwater <br /> elevation also resulted in static groundwater entering the deep soil vapor extraction wells <br /> During the summer of 1996, sampling of the groundwater monitoring wells was discontinued and <br /> sampling of the deep sod vapor extraction wells begun <br /> On May 20, 1998, Ramage Environmental published a Problem Assessment Report and <br /> Corrective Action Plan for the site Sod vapor extraction and air sparging were recommended as <br /> the most efficient and practical remedial alternatives Design plans were prepared for bid <br /> solicitation <br /> 1 <br /> �5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.