Laserfiche WebLink
• Process and instrumentation diagram which depicts wells, manifold configuration, valves, <br /> rsample ports, and process control and monitoring devices <br /> • Construction details for wellheads, trench cross-sections, concrete pad, fence post footings, <br /> Isecurity bollards and well manifold <br /> ' 44 Schedule <br /> A proposed time schedule for the design, permitting, construction and start-up of a vapor <br /> Iextraction system for the subject site is presented below The schedule assumes time frames for <br /> regulatory approvals, construction scheduling and lead time for the required new utility services <br /> rActrvi Estimated Start Date Estimated Completion Date <br /> ICorrective Action NA June 1998 <br /> Plan Approval <br /> Air Quality Permitting June 1998 June 1998 <br /> Utility Service Applications June 1998 June 1998 <br /> Engineering Design June 1998 June 1998 <br /> Construction Scheduling July 1998 July 1998 <br /> r <br /> System Construction August 1998 August 1998 <br /> ISystem Start-up August 1998 <br /> I <br /> 1 <br /> �1 <br /> r17 <br /> I <br />