Laserfiche WebLink
BMW- <br /> Mw-11 <br /> -24.44 <br /> SB-12 '-'460 I <br /> 10"On III <br /> OSNG VIAY <br /> S10ERMA <br /> MW-7 . SB-10 <br /> -24.32 <br /> R ALL <br /> FUEL DISPENSER MW-6 EY <br /> LOCATION -24.25 $- - <br /> MW-9 CONCRETE MW-4 <br /> -24.09 Mw- . _24.27 <br /> MW-5 -24.2d" <br /> • <br /> SB-1 -24. `?4.20 <br /> 1 MW- BUILDING4.20SHED <br /> nn1 � <br /> u i <br /> ASPHALT <br /> ALLEY MW-1 . <br /> -24.12 <br /> Z leSB-9 � FORMER <br /> - <br /> O gj UST LOCATKm <br /> z <br /> �s 1 <br /> % u <br /> MW-10 <br /> -23.63 <br /> PROJECT:54.22493.0001 <br /> MASSOCIAIS INC. DATE: 07/23/08 <br /> LEGEND• Ito in?*bm &LaWe*w0ioa DRAWING:EGGIMAN <br /> 9 GROUNDWATER' MONITORING WELL LOCATION APPROXIMATE SCALE•SOIL BORING LOCATION 1112 EAST HARDING WAY <br /> STOCKTON., CALIFORNIA <br /> 00000 GROUNDWATER ELEVATION CONTOUR 60 0 60 FEET GROUNDWATER CONTOUR MAP <br /> ,1At,0 CONTOUR INTERVAL - 0.20 FEET <br /> *'NOT USED FOR CONTOURING .JULY 1, 2008 <br /> FIGURE 3 <br />