My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002567
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
1112
>
3500 - Local Oversight Program
>
PR0545263
>
ARCHIVED REPORTS_XR0002567
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2020 6:59:46 PM
Creation date
2/3/2020 10:49:53 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002567
RECORD_ID
PR0545263
PE
3528
FACILITY_ID
FA0005108
FACILITY_NAME
EGGIMANS HYDRAULIC GARAGE
STREET_NUMBER
1112
Direction
E
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
15102101
CURRENT_STATUS
02
SITE_LOCATION
1112 E HARDING WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ASSOCIATESCV2 <br /> I N C . <br /> Off-site Well Samplins <br /> A well located at the northeast corner of the State Hospital located on Harding Way will be <br /> sampled by ATC personnel. This well, approximately 800 feet west of the site is the closest water <br /> well. The well will be sampled pending an access agreement with the owner of the well. <br /> Sample Analysis <br /> All soil and groundwater samples from the soil borings will be immediately placed in a cooler with <br /> ice and delivered under chain-of-custody documentation to a State-certified analytical laboratory. <br /> Soil and groundwater samples will be analyzed for total petroleum hydrocarbons as gasoline <br /> (TPHg), benzene, toluene, ethylbenzene, and xylenes (BTEX) by EPA Methods 8015m/8020, and <br /> oxygenate fuel additives by EPA method 8260. <br /> Report Preparation <br /> Upon completion of the investigative activities, a summary report will be prepared for submittal to <br /> the EHD and Regional Water Quality Control Board. The report will include a description of all <br /> field activities, laboratory analytical results, and well/boring logs. <br /> All work described in this workplan will be performed under the direction of a California <br /> Registered Professional Engineer. All work will be performed in accordance with ATC's Site <br /> Safety Plan (SSP) and Quality Control/Quality Assurance Plan already on file with PHS/EHD for <br /> this site. <br /> Proiected Schedule <br /> Once approval of this workplan has been received, ATC will confirm a schedule for drilling <br /> activities. ATC will notify EHD at least 48 hours prior to beginning any field activities. The <br /> summary report will be submitted to EHD approximately four to five weeks after the completion <br /> of field activities. <br /> w:192054.00011 rep0rtS\Wkpin_add_inv.doc 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.