My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002569
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
1112
>
3500 - Local Oversight Program
>
PR0545263
>
ARCHIVED REPORTS_XR0002569
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2020 6:57:09 PM
Creation date
2/3/2020 10:50:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002569
RECORD_ID
PR0545263
PE
3528
FACILITY_ID
FA0005108
FACILITY_NAME
EGGIMANS HYDRAULIC GARAGE
STREET_NUMBER
1112
Direction
E
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
15102101
CURRENT_STATUS
02
SITE_LOCATION
1112 E HARDING WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATC SITE SAFETY PLAN <br /> PERSONAL PROTECTIVE EQUIPMENT <br /> As a minimum Level D protection is required on all ATC worksites. Level D includes: <br /> ✓ Steel toed boots <br /> ✓ Safety Glasses <br /> ✓ Hard Hat <br /> For each task on this project, identify additional protective garments as required, include the <br /> conditions under which the level of PPE would be modified for each task. <br /> Task(s) Condition Personnel Garment(s) <br /> Working Near Vehicle Orange Vests <br /> 1 X20 ppm for 5 minutes 1/2 Face Respirator <br /> 1 X200 ppm for 5 minutes Evacuate Site Full Face Respirator <br /> I <br /> SITE CONTROL AND COMMUNICATIONS <br /> The buddy system must be used on all ATC hazardous waste sites. <br /> Site will be secured as follows: Fencing will be used when possible. <br /> Work Zones will be marked as follows:Orange cones or barricades and caution tape will be used to <br /> mark off work zone where traffic is present. <br /> MARK WORK ZONES ON SITE MAP O CHECK WHEN DONE. <br /> PAGE 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.