Laserfiche WebLink
State WAter resources Control iialard w m <br /> o <br /> _ Division of Clean Water Programs <br /> Winston H.I3ickox 1001 I Street-Sacramento,California 95814-(916)341-5656 <br /> Mailing Address: P.O.Box 944212•Sacramento,California-94244-2120 Gray Davis <br /> Secretary for FAX(916)341-5806-Internet Address: http:IJwww.swrcb.ca,gov/cwphome/ustcf Governor <br /> Fnvironmental <br /> Protection <br /> i <br /> f - <br /> 1 November 22,2000 <br /> rQ <br /> r t <br /> Mr. Kashmir Singh <br /> Mr. Dalwinder Dhoot , . <br /> Joe's Truck Plaza - <br /> 15600 South Harlan Road <br /> Lathrop,CA 95330 <br /> PRE-APPROVAL OF CORRECTIVE ACTION COSTS, CLAIM NO. 12489 <br /> SITE ADDRESS 15600 S HARLAN RD,,LATHROP <br /> I . <br /> I have received your request for reconsideration of my October 11, ?000 cost pre-approval letter <br /> and the additional bid for installation and sampling often Geoprobe borings at the above- <br /> referenced site. With the following provisions, the total cast pre-approved as eligible for' <br /> reimbursement for completing the May 18, 2000 Avalon Environmental Consultants' workplan <br /> is $10,178, see the table below for a breakdown of costs. This letter supersedes my October <br /> 11.,2000 pre-approval letter. <br /> _ Be aware that this pre-approval does not constitute a decision on reimbursement, necessary (as <br /> determined by the Fund) corrective action costs for action work directed and approved by the <br /> San Joaquin County Public Health Services will be eligible for reimbursement at costs <br /> consistent with those pre-approved in this letter <br /> t All costs for corrective action must meet the requirements of Article ll Chapter 16, <br /> Underground,Storage Tank Regulations in order to be eligible far reimbursement. <br /> i .. <br /> t COST PRE-APPROVAL BREAKDOWN <br /> Task Amount Pre-Approved Comments <br /> 1 Workplan Preparation �� 0 Work is already complete <br /> } # Please note: hourly.'wagefor <br /> 2. Project Engineer/Geologist is high <br /> compared with what Fund staff <br /> Access Agreement app normally see. However,overall <br /> costs are reasonable. Fund staff <br /> will review time overruns <br /> carefully. <br /> .3 Rece for Surve 230 <br /> t <br /> c&ffforrets Ew viroB wej7m,1ProAectioB 1,1e7cy <br /> . 1 �,� RecyctedPaper <br />