My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
15600
>
3500 - Local Oversight Program
>
PR0545273
>
WORK PLANS_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2020 12:04:40 PM
Creation date
2/3/2020 11:07:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
FileName_PostFix
FILE 1
RECORD_ID
PR0545273
PE
3528
FACILITY_ID
FA0000174
FACILITY_NAME
JOES TRAVEL PLAZA
STREET_NUMBER
15600
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19620079
CURRENT_STATUS
02
SITE_LOCATION
15600 S HARLAN RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms.Margaret Lagorio,SJCEHD October 21,2003 <br /> Joe's Truck Plaza Project No.2033-15600-01 <br /> Work Plan for Additional Site Assessment <br /> Page 6 <br /> sandy zone is in hydraulic communication with the water in the upper sandy zone, to <br /> evaluate the groundwater flow regime in the lower sandy zone, and to characterize if, or <br /> to what extent, the lower sandy zone has been impacted by dissolved gasoline <br /> constituents. <br /> Data evaluated for the SCM suggest that much of the residual gasoline compounds <br /> beneath the site are found in the vicinity of the northern UST's. To evaluate the <br /> feasibility of extracting residual mass for remediation, Stratus proposes to conduct both <br /> GWE and DPE feasibility tests. Because the SCM suggests that, as constructed, well <br /> MWO-1X might be providing a vertical conduit allowing communication between the <br /> upper and lower sandy zones, Stratus proposes to properly destroy this well by drilling it <br /> out to total depth, backfilling it with cement to the top of the hard clay (approximately 18 <br /> feet bgs), and constructing extraction well EX-1 in the remaining borehole. This <br /> proposed extraction well would be screened wholly within the upper sandy zone. <br /> Existing monitoring wells MW-1 and MW-2, and proposed monitoring wells MW-7, <br /> MW-8, and MW-18 will be used to observe the effects of GWE and DPE in the upper <br /> sandy zone. Deeper-screened well DW-2 will be utilized to observe if the GWE and DPE <br /> tests affect groundwater in the lower sandy zone. <br /> As an interim measure, Stratus proposes to install fifteen ozone sparge wells (IW-1 <br /> through IW-15). These wells willl be screened near the base of the upper sandy zone. <br /> The purpose of the ozone is to supplement the dissolved oxygen levels in the <br /> groundwater to enhance the biogenic breakdown and natural attenuation of the MTBE. <br /> Ozone sparging is a cost effective means of addressing the MTBE concentrations <br /> identified northeast of the site. This technology appears to provide immediate reduction <br /> in MTBE concentrations. Stratus has had success using ozone sparging at other sites in <br /> San Joaquin County. Wells MW-3 and MW-8 through MW-12 will be utilized to <br /> monitor the effectiveness of the ozone sparging. <br /> The proposed scope of work presented above has been subdivided into tasks 1 through 5. <br /> All geologic work will be conducted under the supervision of a State of California <br /> Registered Geologist or Registered Engineer, and will be conducted in accordance with <br /> standards established by the Tri-Regional Board Guidelines for Hydrocarbon Site <br /> Assessment and Remediation (RWQCB 1991) and SJCEHD guidelines. Additional <br /> information regarding Stratus' field practices and procedures is presented in Appendix A. <br /> Task 1: Pre-Field Activities <br /> Following approval of this work plan by SJCEHD, the following activities will be <br /> implemented: <br /> • Secure an access agreement and encroachment permit for installation of off-site <br /> wells. <br /> P:\Joe's Truck Plaza\Work Plans\Joes workplan 102103.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.