My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002610
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
15600
>
3500 - Local Oversight Program
>
PR0545273
>
ARCHIVED REPORTS_XR0002610
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2020 6:29:09 PM
Creation date
2/3/2020 11:18:17 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002610
RECORD_ID
PR0545273
PE
3528
FACILITY_ID
FA0000174
FACILITY_NAME
JOES TRAVEL PLAZA
STREET_NUMBER
15600
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19620079
CURRENT_STATUS
02
SITE_LOCATION
15600 S HARLAN RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> Joe's Truck Stop <br /> Page 3 <br /> • October 6, 1999 <br /> 1 <br /> OBJECTIVE <br /> 1 The objective of the investigation is to establish the severity, and limit if possible, of a known <br /> groundwater impact at the subject property and offsite properties. <br /> SCOPE OF WORK <br /> Site Safety and Health Plan <br /> 1 <br /> Prior to subsurface testing, as required by law, a Site Safety and Health plan will be <br /> prepared in order to insure that all workers and sub-contractors are aware of the risks <br /> and safety procedures associated with this Phase II Groundwater Investigation <br /> Underground Service Alert <br /> As required by law, Underground Service Alert (USA) will be contacted to check the <br /> proposed well locations forconflict with-public utilities, such as gas or electrical lines <br /> . Well Construction <br /> Due to the depth to groundwater which is at a depth of approximately nine feet bgs, <br /> the offsite borings will be terminated at 20 feet bgs The one boring drilled on site will <br /> be terminated at a depth of approximately 30 feet and screened from 20 to 30 feet in <br /> order to test the deeper aquifer The upper five feet will consist of schedule 40 PVC <br /> solid casing The lower 15 feet will consist of schedule 40 PVC slotted casing with <br /> ( 010 size slot) 216 sand will be used around the slotted casing, a hydrated bentonite <br /> seal will be placed above the sand column, and will be followed by neat cement <br /> Wells will be flush mounted with locking caps <br /> Well Development <br /> Wells will be developed by a licenced C-57 driller using a smeal rig A surging pump <br /> will be used to purge the well and extract any fine grained material left in the <br /> monitoring well which might inhibit well development. This will be performed the <br /> day following the well installation. <br /> r <br /> Soil Sampling <br /> Soil samples will be collected every five feet. Soil samples will be field screened with <br /> a PID and select samples will be analyzed from each boring. At least two samples will <br /> be analyzed from each boring. Soil samples will be analyzed for Total Petroleum <br /> . Hydrocarbons as Gasoline (1'PH-G) by EPA Modified 8015, Benzene, Toluene, Ethyl <br /> Benzene, and Xylenes (BTEX) by EPA Method 8020, and for Oxygenated Compounds <br />
The URL can be used to link to this page
Your browser does not support the video tag.