My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002611
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
15600
>
3500 - Local Oversight Program
>
PR0545273
>
ARCHIVED REPORTS_XR0002611
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2020 6:41:43 PM
Creation date
2/3/2020 11:18:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002611
RECORD_ID
PR0545273
PE
3528
FACILITY_ID
FA0000174
FACILITY_NAME
JOES TRAVEL PLAZA
STREET_NUMBER
15600
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19620079
CURRENT_STATUS
02
SITE_LOCATION
15600 S HARLAN RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> Identified in Avalon's previous reports suggests that the gradient is to the <br /> north/northeast Borings will be placed on and offsite of the property <br /> 1 <br /> Emergency Response No <br /> 5.0 PROJECT ORGANIZATION <br /> 1 5.1 Project Staffing/Chain of Command <br /> Titles Names (Phone #/Pager) <br /> Project Manager/FSS Trevor Santochi (714) 836-6637/(714) 287- <br /> 5760 <br /> Crew Size No <br /> Project Managers/FSS 1 <br /> Equipment Operators: 2 <br /> Technicians. 1 <br /> Laborers 0 <br /> • 5.2 Organization and Responsibilities <br /> Avalon will oversee all phases of the project The following management <br /> structure wI I I be instituted for the purpose of successfully and safely completing <br />' this protect <br /> Project Manager: <br /> The Project Manager will be responsible for implementing the project and <br /> obtaining necessary personnel or resources for the completion of the project <br /> Specific duties will Include <br /> • Coordinating the activities of all subcontractors, to Include Informing <br /> them of the required Personal Protective Equipment (PPE) and ensuring <br /> their signature acknowledging this site Health and Safety Plan <br /> • Selecting a Field Safety Supervisor(FSS) and field personnel for the work <br /> to be undertaken on site. <br /> 0 Ensuring that the tasks assigned are being completed as planned and on <br /> schedule <br /> Avalon Environmental Consultants 9627-001-7 <br /> Kashmar Singh foes Truck Plaza <br /> I February 1, 2002 3 Lathrop, California <br />
The URL can be used to link to this page
Your browser does not support the video tag.