Laserfiche WebLink
1 <br /> Identified in Avalon's previous reports suggests that the gradient is to the <br /> north/northeast Borings will be placed on and offsite of the property <br /> 1 <br /> Emergency Response No <br /> 5.0 PROJECT ORGANIZATION <br /> 1 5.1 Project Staffing/Chain of Command <br /> Titles Names (Phone #/Pager) <br /> Project Manager/FSS Trevor Santochi (714) 836-6637/(714) 287- <br /> 5760 <br /> Crew Size No <br /> Project Managers/FSS 1 <br /> Equipment Operators: 2 <br /> Technicians. 1 <br /> Laborers 0 <br /> • 5.2 Organization and Responsibilities <br /> Avalon will oversee all phases of the project The following management <br /> structure wI I I be instituted for the purpose of successfully and safely completing <br />' this protect <br /> Project Manager: <br /> The Project Manager will be responsible for implementing the project and <br /> obtaining necessary personnel or resources for the completion of the project <br /> Specific duties will Include <br /> • Coordinating the activities of all subcontractors, to Include Informing <br /> them of the required Personal Protective Equipment (PPE) and ensuring <br /> their signature acknowledging this site Health and Safety Plan <br /> • Selecting a Field Safety Supervisor(FSS) and field personnel for the work <br /> to be undertaken on site. <br /> 0 Ensuring that the tasks assigned are being completed as planned and on <br /> schedule <br /> Avalon Environmental Consultants 9627-001-7 <br /> Kashmar Singh foes Truck Plaza <br /> I February 1, 2002 3 Lathrop, California <br />