Ms Margaret Lagorno, SJCPHS September 28,2004 <br /> Dual Phase Extraction Test Report <br /> Joe's Truck Plaza,Lathrop,California <br /> Page 5 <br /> test procedures adopted were generally consistent with activities outlined in Stratus' <br /> October 21, 2003, Work Plan for Additional Assessment A site-specific safety plan was <br /> developed and discussed during the field activity Adequate measures were taken to <br /> protect personnel and equipment during the testing activity <br /> Test Well Description <br /> Well MW-7 was constructed in May 2004, to a total depth of 19 feet bgs using a 4-inch <br /> diameter well casing The well screen consisted of 15 feet of 0 02-inch diameter factory <br /> slotted casing, installed from approximately 4 to 19 feet bgs This well was designed to <br /> allow both soil vapor and groundwater to be extracted from the vadose, smear, and <br /> saturated zones <br /> DPE Test Equipment <br /> A Solleco thermal oxidizer, rated at 400 standard cubic feet per minute (scfm) with a <br /> 25-horse power (hp) liquid-nng pump, was used to apply vacuum and extract soil vapors <br /> and groundwater from well MW-7 The trailer-mounted system also housed a 100-gallon <br /> water/condensate knockout tank and a 2 hp liquid discharge pump to drain the knockout <br /> tank A propane generator rated at 49 kilowatts was used to power the DPE unit Liquid <br /> propane was used as supplemental fuel to maintain combustion temperatures in the <br /> thermal oxidizer The DPE equipment, generator, Baker tank, test well, observation <br /> wells, and other testing equipment were cordoned-off with delineators, barricades, and <br /> caution tape The DPE unit, generator, and other equipment were housed within a <br /> temporary fence enclosure, identified in Figure 2 <br /> The wellhead of extraction well MW-7 was temporarily modified to provide a seal for <br /> vacuum conditions and to facilitate insertion of a drop-tube (1 5-inch diameter) to extract <br /> soil vapors and groundwater <br /> The liquid ring pump was used to extract groundwater and soil vapors from extraction <br /> well MW-7 The extracted groundwater and soil vapor (dual phase flow) were directed <br /> to a knock out tank The separated vapors from the knockout tank were directed to the <br /> thermal oxidizer for abatement before discharging to the atmosphere The groundwater <br /> was transferred from the knock out tank to a 21,000-gallon holding tank using the 2 hp <br /> transfer pump on the unit Groundwater from the holding tank was transported and <br /> disposed of at McKittrick Waste Disposal Facility (MKWDF) in McKittnck, California, <br /> by Intergrated Wastestream Management, Inc (IWM) A total of 19,100 gallons of <br /> extracted groundwater, which includes approximately 300 gallons holding tank rinsate <br /> water, was disposed of at MKWDF Copies of the certificates of disposal are included in <br /> Appendix A <br /> • <br /> P Voe s Truck Plaza\Reports\DPE TestUoes Truck DPE Test Report doc 5 rRA 7u5 <br />