Laserfiche WebLink
1.0 EXECUTIVE SUMMARY <br /> 1 Avalon Environmental Consultants (Avalon) conducted a Fourth Quarter Groundwater <br /> Monitoring at the request of Mr Kashmar Singh and Mr Dalwinder Dhoot, owners of <br /> Joe's Truck Plaza The first and second quarters of 2001 were missed The assessment <br /> was performed at the Joe's Truck Plaza located at 15600 South Harlan Road, Lathrop, <br /> County of San Joaquin, California, on November 5, 2001 <br /> 1 <br /> On November 5, 2001, six groundwater monitoring wells were purged and sampled <br /> on the subject property Groundwater samples were analyzed for Total Petroleum <br /> Hydrocarbons as diesel (TPHd), Total Petroleum Hydrocarbons as gasoline (TPHg), <br /> Benzene, Toluene, Ethyl benzene and Xylene (BTEX), Lead scavengers (1,2-DCA and <br /> 1 EDB), and Oxygenates including Ethanol and Methanol <br /> Four of the six groundwater monitoring wells on the subject property detected Methyl- <br /> t-butyl-ether (MTBE) The highest detection of MTBE encountered is 730 parts per <br /> billion (ppb) found in groundwater monitoring well MW-2, located northeast of the <br /> 1 former tank farm excavation The second highest detection was in MW-3, located east <br /> of the former tank farm excavation The level of MTBE found in MW-3 was 110 ppb <br /> Based upon groundwater measurement taken at the subject property on November 5, <br /> 2001, the groundwater gradient is to the east with a northeast component <br /> 20 GROUNDWATER SAMPLING PROCEDURES <br /> All wells were purged until the pH, conductivity and temperature stabilized or until at <br /> least three well volumes were evacuated The pumping rate during the purging of all <br /> wells was approximately one gallon per minute (gpm) A total volume of <br /> approximately 5 to 6 gallons were discharged from each well All purged groundwater <br /> was collected in 55-gallon, Department of Transportation (DOT) approved drums, <br /> sealed and temporarily stored on-site pending disposal based on the laboratory results <br /> Before initiating sampling activities, measurements of the depth to water and depth to <br /> i bottom of the well casing were made to determine the well volume for all wells A <br /> minimum of three well volumes were purged from all monitoring wells before <br /> collecting groundwater samples <br /> The pH, temperature, and specific conductivity of the groundwater were measured <br /> i during the well purging phase The final measurements were compared with physical <br /> water quality data obtained during well development to ensure that aquifer water was <br /> inside the well casing before collecting samples A summary of the field measurements <br /> during well purging is presented in Appendix II The water samples were collected <br /> with hand held PVC disposable bailers Sample containers were labeled and chilled <br /> i on ice immediately after collection Groundwater samples were analyzed for Total <br /> Avalon Environmental Consultants <br /> Project#9627-001-8 <br /> Joe's Truck Plaza 15600 South Harlan Road <br /> December 5, 2001 1 Lathrop, California <br /> I <br />