Laserfiche WebLink
CROSS SECTION A-A' <br /> A A' <br /> G-1 MW-1 G-3 GP-3 GP-5 GP-8 GP-10 <br /> r\ I <br /> Ir Former tank pd <br />► _J I _ <br /> 10- ND 150 1700= 420 71 p 2600 i 780 <br /> 1 <br /> GROUNDWATER RESULTS <br /> MTBE results In ppb <br /> I <br /> LEGEND <br /> GP-5 -Represents new geoprobe <br /> borings placed January 2001 <br /> G-3- Represents geoprobe <br /> borings placed December 1998 <br /> MW-1- Represents existing <br /> monotering wells last sampled <br /> In January 2001 <br /> i <br /> CROSS SECTION A-A' <br /> Site Address 15600 Harlm Road Client Name Dalwznder Dhoot <br /> Site City/State Lathrop, California Project No 9627-001-6 <br /> AVALON ENVIRONMENTAL CONSULTANTS NOT TO SCALE <br /> 131 NORTH TUSTIN AVENUE, SUITE 213 <br /> TUSTIN, CALIFORNIA FIGURE 2 <br />