Laserfiche WebLink
1= <br /> Organic carbon in the area of impact is high, possibly due to residual hydrocarbons <br /> 1 left in place <br /> Hydrology - Groundwater at the subject site is approximately 9 feet bgs in this <br /> investigation Previous groundwater monitoring events at the subject property <br /> suggest a north, northeastern gradient direction <br /> 0 3.3 Site History <br /> According to the current owners of the site, Kashmir Singh and Dalwidner Dhoot, <br /> the subject property was a fruit stand in 1952 In 1972 Joe Takashita, built a <br /> gasoline service station which was called Tokyo Joe's In 1986, the property was <br /> M sold to Joseph Jakary and continued as a gasoline service station In 1991, the <br /> service station was sold to Harry Mogairian, and then in 1993 the property was <br /> sold to the current owners, Kashmir and Dalwidner Dhoot The property is still <br /> referred to as Joe's Place Truck Stop According to the current owners, while under <br /> li Joe Takashita's control, the site may have been a Texaco franchise <br /> 4.0 SUMMARY OF PHASE II FIELD OPERATIONS <br /> 4.1 Utility Clearance <br /> 0 • Forty-eight hours prior to work, as required by law, Underground Service Alert was <br /> contacted in order to provide clearance of the boring locations from any possible <br /> underground utility lines which might exist on the subject property <br /> 4.2 Soil Boring and Soil Sampling Procedures (Geoprobe) <br /> Prior to the start of the drilling operations, a tailgate Health and Safety meeting was <br /> conducted by the Project Manager to discuss potential health and safety risks and <br /> the appropriate precautions required to reduce such risks <br /> The soil boring locations are shown in Appendix I Enviroprobe of Anaheim, <br /> California, performed the drilling and soil sampling under the supervision of an <br /> Avalon Registered Geologist Enviroprobe used a Geoprobe system to advance the <br /> soil borings and to obtain cores of soil samples The work was performed on <br /> January 22 and January 23 2001 <br /> The boreholes were continuous cored with a rig equipped with a hydraulic- <br /> powered percussion drive sampler Soil samples were obtained with a probing <br /> tool lined with three (3) 1-inch diameter clear plastic tubes The probing tool was <br /> pushed or hammered hydraulically into the soil The open ends of the retained <br /> • Avalon Environmental Consultants 9627001-6 <br /> toes Truck Plaza <br /> April 15 2001 4 15504 S Harlan Road <br /> Lathrop California <br />