Laserfiche WebLink
1 <br /> I <br /> 290 ppb MTBE <br /> 1 6pb TAME <br /> 8 4 ppb Tert-0butanol 140pppb Diesel <br /> 64 ppb Diesel <br /> MW-2 MW-3 <br /> 1 2 800 ppb MTBE <br /> 2 5 ppb TAME <br /> 61 ppb Tent butanol <br /> -� Northem Underground <br /> Tank Pad(Existing) <br /> I � 1 <br /> Building Scale <br /> LJ <br /> Q <br /> ONorthern Dispenser <br /> 1 <br /> Planter Southern Truck <br /> Dispenser area <br /> I X �� 9 9 ppb MTBE <br /> �A 96 ppb a�esel <br /> I]YI I <br /> Former Tank Farm <br /> MW-6 <br /> 1 <br /> MW-5 <br />' Above Ground Tanks <br /> GROUNDWATER CONCENTRATION MAP <br /> 1 Srte Address 15600 Harlan Road Client Name Toes Truck Plaza <br /> Site City/State Lathrop, California Project No 9627-001-3 <br /> 'Q AVALON ENVIRONMENTAL CONSULTANTS 50 100 <br /> 131 NORTH TUSTIN AVENUE, SUITE 213 <br /> 1 TUSTIN, CALIFORNIA FIGURE 1 <br />