My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002634
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
15600
>
3500 - Local Oversight Program
>
PR0545273
>
ARCHIVED REPORTS_XR0002634
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2020 6:37:28 PM
Creation date
2/3/2020 11:26:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002634
RECORD_ID
PR0545273
PE
3528
FACILITY_ID
FA0000174
FACILITY_NAME
JOES TRAVEL PLAZA
STREET_NUMBER
15600
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19620079
CURRENT_STATUS
02
SITE_LOCATION
15600 S HARLAN RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Avalon Environmental Consultants <br /> HEALTH AND SAFETY PLAN <br /> CLIENT: Kashmar Singh and Dalwinder Dhoot <br /> SITE ADDRESS: Joes Truck Stop, 15600 S. Harlan Road, Lathrop, California <br /> CLIENT CONTACT: Kashmar Singh PHONE: 209-982-0370 <br /> PROPOSED START DATE: PROPOSED DURATION: Two days <br /> PROJECT SUPERVISOR: Trevor Santochi <br /> 1.0 INTRODUCTION <br /> The Health and Safety Plan (HASP) will be used to ensure that adequate site safety <br /> practices are used during the Limited Phase II Environmental Site Assessment at the <br /> above mentioned site <br /> This Health and Safety Plan was prepared by Avalon Environmental Consultants <br /> (Avalon) on behalf of Washington Mutual Bank (WMB) This HASP provides an <br /> overview of conditions at the subject property and describes the safety procedures to <br /> be employed and the rationale for their selection This HASP has been prepared to <br /> address any potentially health threatening contingencies All personnel working at the <br /> site will be briefed by the site Health and Safety Coordinator and will be required to <br /> become familiar with the following sections of this plan <br /> Contingency Plan and Emergency Procedures <br /> Safety Rules and Personal Hygiene - Appendix A <br /> Field Standard Operating Procedures for Putting On and Decontaminating Personal <br /> Protective Equipment - Appendix B <br /> Heat Stress and Heat Stress Monitoring -Appendix C <br /> Avalon personnel are included in a medical monitoring program that is described in <br /> Appendix D <br /> All onsite personnel performing these field activities, including Avalon personnel and <br /> contractors working under the direction of Avalon, will be subject to the standards, <br /> Avalon Environmental Consultants 9627-001-2 <br /> ywF Kashmar Singh Joes Truck Stop <br /> October 20, 1998 Lathrop,California <br />
The URL can be used to link to this page
Your browser does not support the video tag.