Laserfiche WebLink
I j � <br /> r <br /> 2 <br /> i <br />' 24 January 1997 <br /> • AGE-NC Project No 97-0288 <br />' Page 5 of 5 <br /> geologic/hydrogeologic conditions at the site for the purpose of this investigation are made from a <br />' limited number of available data points (i e soil, grab ground water samples) and subsurface <br /> conditions may vary away from these data points No other warranty, expressed or implied, is made <br /> as to the professional recommendations contained in this report <br /> I I <br /> r <br /> is 11 Ir a <br /> � y <br /> I ` <br /> • <br /> I ' <br /> s <br /> I I I <br />