Laserfiche WebLink
f <br /> F <br /> C <br /> REMEDIATION SCHEDULE <br /> 1990 <br /> I <br /> Excavate contaminated soil July 16 <br /> Test excavated site in-situ soil July 16 i <br /> i <br /> S pread soil and mix with ,manure July 16-18 <br /> I <br /> Y <br /> Determine extent of contamination July 30 <br /> If necessary, hire remediation firm August 6 <br /> r Initial lab test of soil spread August 27 <br /> L Determine success or adjustment September 10 <br /> Y <br /> of fertilizer <br /> rrrr Second lab test of soil spread October 1 <br /> ' I Determine success of remediation October 10 <br /> El <br /> Seek certification of remediation October 15 <br /> � or dispose of contaminated soil off site i <br /> I <br /> I <br /> rr� <br /> L <br /> id <br /> i <br /> C 6 <br /> 6: <br />