Laserfiche WebLink
REMEDIATION SCHEDULE <br /> 1990 <br /> Excavate contaminated soil July 16 <br /> Test excavated site in-situ soil July 16 <br /> Spread soil and mix with manure July 16-18 <br /> Determine extent of contamination July 30 <br /> If necessary, hire remediation firm August 6 <br /> Initial lab test of soil spread August 27 <br /> ii Determine success or adjustment September 10 <br /> of fertilizer <br /> t <br /> Second lab test of soil spread October 1 <br /> Determine success of remediation October 10 <br /> Seek certification of remediation October 15 <br /> or dispose of ,contaminated soil off site <br /> f <br /> f L. <br /> I <br /> f <br /> 3 <br /> I <br /> it <br /> 6 <br />