Laserfiche WebLink
COMMENT #4: Date Name Act Hours <br /> 7/17/89 REUSS 202 0.9 ST <br /> (a) Referred the sample report to Air Pollution Control District (APCD) <br /> since soil is aerating under APCD permit (see 7/14/89 phone <br /> conversation with Nicolas Bokides) . <br /> (b) Began written request for a formal report which complies with <br /> format mentioned in Tri-Regional Board Staff Recommendations. <br /> COMMENT #5: Date Name Act Hours <br /> 7/25/89 REUSS 215 0.5 ST <br /> (a) Continued review of, the data in the files in an attempt to <br /> understand the placement of the tanks and contamination at this <br /> site. <br /> COMMENT #6: Date Name Act Hours <br /> 7/26/89 REUSS 212 0.5 ST <br /> (a) Telephoned Nicolas Bokides of Precision Industries to set up an <br /> appointment to do a field assessment and to discuss the resampling <br /> of the stockpiled soil. <br /> COMMENT #7: Date Name Act Hours <br /> 7/26/89 REUSS 207 4 . 7 ST <br /> (a) Prepared a summary of the work completed to date at this site. <br /> COMMENT #8: Date Name Act Hours <br /> 7/26/89 REUSS 202 0. 7 ST <br /> (a) Revised my comment letter so it requested that the formal report <br /> address possible contamination in the trench area. <br /> COMMENT #9: Date Name Act Hours <br /> 7/27/89 REUSS 207 1 .0 ST <br /> (a) Finished an outline of the history of this site, today. This <br /> summary includes a map of the location of tanks at this site. Tank <br /> numbers have been labelled to match the numbering system in our <br /> file. <br /> COMMENT #10: Date Name Act Hours <br /> 8/1/89 REUSS 215 0.5 ST <br /> (a) Revised map of the site after reviewing the file and discussing the <br /> site with Kasey Foley of our staff. <br /> 2 <br />