Laserfiche WebLink
�..i REQUISITION REQUEST <br /> Vendor Name Stockton Service Station Equipment Date 2/18/88 <br /> quantity Ur.i.t Part # Description Unit Price Amount <br /> Met with Larry ind Al at 2 :00 PM re plumbijig repairs as needed and <br /> e liressurtzinj <br /> 1) he visual eak is a seepage in an elb w connection in the <br /> M-Tp'p. Y ' <br /> opin on a large enough leak to cause the g llon per hour loss <br /> a <br /> state. i <br /> 2) Recommend e cavation of entire tank to since leak rust be <br /> T11 a rother area of t e tank thatmay be loose and causing a leak. <br /> 2Y'25/88 <br /> 88 <br /> 3 ) Replaced lk" union on suction line from ; tank to pump: <br /> Pressure tes ed all pipes from tank t5 pump with poun s <br /> off pressure. Lines tested OK. Foundcracked pump housing <br /> OIL pump, re acre I - <br /> i <br /> Sub Tota <br /> Site: WO# Tax <br /> Requested by: Allan per Joe Total <br /> Reason for Purchase: unleaded fuel loss leak during precision test <br /> of fuel tanks <br /> Is this needed as : A Walkthrough An Emergency <br /> In 7 - 10 days An Open PO <br /> Approval Date <br /> Budget: Vendor # <br /> 8/87 1 <br />