My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HOGAN
>
5154
>
3500 - Local Oversight Program
>
PR0545283
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2020 12:34:09 PM
Creation date
2/3/2020 11:41:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545283
PE
3528
FACILITY_ID
FA0004712
FACILITY_NAME
WILLIAM BURKHARDT
STREET_NUMBER
5154
STREET_NAME
HOGAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06112001
CURRENT_STATUS
02
SITE_LOCATION
5154 HOGAN LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 <br /> AGE-NC-95-0152 <br /> Site Health and Safety Plan <br /> Page 3 of 5 <br /> Based on evaluation of potential hazards, the following levels of personal protection have been <br /> designated for the applicable work areas or task: <br /> I <br /> Location Job Function Levels of Protection <br /> I <br /> Exclusion Zone Drill probes A B C D Other <br /> Reduction Zone Preserve samples A B C D Other <br /> and log probes <br /> JSupportZone Support functions A B C D Other <br /> Specific protective equipment for each level of protection used is follows: <br /> Level D hard hat <br /> steel-toed boots <br /> half faced resp. (if nec.) <br /> gloves <br /> safety glasses <br /> If air purifying respirators are authorized, organic vapor and dust is the appropriate canister for use <br /> with the itr olved substances and concentrations. <br /> No changes of the specified levels of protection shall be made without the approval of the site safety <br /> officer and the project team leader. <br /> 6.0. ON-SITE WORK PLANS <br /> Work party(ies) consisting of two persons will perform the following tasks: <br /> Project Team Leader: Task: <br /> Timothy Cuellar Log borings, preserve samples, obtain samples <br /> Work Party #1: Task: <br /> GeoProbe Operator Advance probes s <br />
The URL can be used to link to this page
Your browser does not support the video tag.