(:V %Tc <br /> A S S O C I A T E S I N C . <br /> For protection of the seal at the land surface, a hole at least two feet in diameter will be <br /> excavated around the outside of each well casing to a depth of approximately two feet below <br /> ground surface. The sealing material used to seal the well will be allowed to spill over into the <br /> excavation. <br /> After the sealing material has set in wells MW1 through MW3, the excavations will be filled <br /> to within approximately 3 inches of surface grade with an aggregate material and the <br /> remaining 3 inches will be filled with asphalt patch to restore the site's appearance. <br /> One permit application and associated fees (check no. 600) are attached. The application is for the <br /> three on-site monitoring wells. <br /> One soil sample will be coIIected from the cuttings generated from the destruction of well MW2. <br /> The soil sample will be analyzed for total petroleum hydrocarbons as gasoline (TPHg) by EPA <br /> method 8015; benzene, toluene, ethylbenzene, and xylenes (BTEX) by EPA methods <br /> 8015M18020, oxygenate fuel additives including methyl tert butyl ether (MTBE), methanol, <br /> ethanol, t-butanol (TBA), di-isopropyl-ether (DIPE), ethyl-t-butyl ether (ETBE), t-amyl methyl <br /> ether, 1,2-dichloroethane (1,2-DCA), and 1,2-dibro mo ethane (EDB) by EPA method 8260, and <br /> dissolved lead by EPA methods 60101200.7. The soil analytical results will be used to profile the <br /> soil cuttings for disposal at the Forward Landfill in Stockton. The drums containing soil cuttings <br /> will be transported to the Forward Landfill for disposal. <br /> Report Preparation <br /> Upon completion of the well destruction activities, a summary report will be prepared for <br /> submittal to San Joaquin County Environmental Health Department (SJCEHD). The report will <br /> include a description of all field activities. <br /> All work described in this workplan will be performed under the direction of a California <br /> Registered Professional Engineer. All work will be performed in accordance with ATC's Site <br /> Safety Plan and Quality Control/Quality Assurance Plan submitted with this workplan. <br /> Projected Schedule <br /> ATC has tentatively scheduled field activities for March 1, 2002. Once approval of this workplan <br /> has been received, ATC will confirm the schedule for drilling activities. ATC will notify SJCEHD <br /> at least 48 hours prior to beginning any field activities. The summary report will be submitted to <br /> SJCEHD approximately two weeks after the completion of field activities. <br /> w:lwordpro1172451reportslwpwell.doc 2 <br />