Laserfiche WebLink
During March 1999, Tait Environmental Management (Tait) supervised the removing of UST#4, <br /> in-place abandoning of UST#8, and soil and/or groundwater sampling from two hand-auger soil <br /> borings (HA-1 and HA-2), two truck-drilled soil borings (B-3 and SB-3), and two groundwater <br /> monitoring wells (MW-1 and MW-2). The boring and well locations are shown on Figure 2, the <br /> well construction and groundwater monitoring data are summarized in Table 1, and the <br /> groundwater analytical results are summarized in Table 2. Tait documented the project results in <br /> Site Assessment Report, dated May 11, 1999. <br /> On July 13, 2000, Tait completed a water well survey for the site vicinity. Tait identified nine water <br /> wells within 2,000 feet of the site, including the municipal irrigation well at Stribley Park. <br /> On February 7, 2002, Ramage Environmental published Monitoring Well Installation and <br /> Groundwater Monitoring Report, which documented the installation of one additional monitoring <br /> well (MW-3), which is shown on Figure 2. The well construction details and groundwater <br /> monitoring data are summarized in Table 1, and the groundwater analytical results are included in <br /> Table 2. <br /> On March 7, 2003, Ramage Environmental published Site Conceptual Model and Work Plan, <br /> Additional Site Investigation and Remedial Feasibility Testing. On July 14, 2003, EHD approved <br /> the work plan. <br /> Also on March 7, 2003, Ramage Environmental installed a passive free product skimmer in MW- <br /> 1, and initiated periodic free product removal site visits. <br /> On December 1, 2003, to further define the plume of impacted groundwater, Ramage <br /> Environmental installed three additional on-site groundwater monitoring wells (MW-4, MW-5 and <br /> MW-6). The well locations are shown on Figure 3, the well construction and groundwater <br /> monitoring data are included in Table 1, and the groundwater analytical results are summarized in <br /> Table 2. Ramage Environmental documented the results of the investigation in Monitoring Well <br /> Installation and Groundwater Monitoring Report, dated January 16, 2004. <br /> On May 20, 2005, Ramage Environmental published Well Installation and Groundwater <br /> Monitoring Report, which documented the installation of one additional groundwater monitoring <br /> well (MW-7) and two remedial feasibility test wells (SVE-lA/B/C and AS-1/SVE-2B). The well <br /> locations are shown on Figures 2 and 3. <br /> 4 <br />