Laserfiche WebLink
" fb <br /> SID RESPONSE FORM <br /> Please provide the outputs and costs that you feel will be needed to fulfill the objectives <br /> stated in the RFB. If the amount of the units is unknown, which will be the case for this <br /> scope of work, please provide a rough estimate. However, it is the unit cost that will be <br /> primarily used for the bidding process. Proposed drilling, sampling, and well installation <br /> materials, equipment and procedures should be described in detail on a separate sheet <br /> TASK 1 PLANNING AND PERMITS <br /> TASK UNIT N UNITS COST/UNIT TOTAL / <br /> A Workplan his ■ <br /> lump sum ` <br /> B Health and safety his <br /> plan lump sum <br /> C Permit fee lump sum 1 $69.00 $09.00 11 <br /> TASK 2 SOIL BORING,MONITORING WELL,VAPOR EXTRACTION WELL INSTALLATION AND SAMPLING <br /> TASK UNIT N UNITS COST/UNIT TOTAL <br /> A Drill soil <br /> borings <br /> 6"diameter linear foot <br /> 6"diameter linear fool <br /> 10"diameter linear foot <br /> A Use of lump sum <br /> field meter <br /> A Professional hourly <br /> field staff <br /> BIC Groundwater <br /> and vapor lest <br /> wells <br /> 2"diameter linear foot <br /> 1 <br />