My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAZELTON
>
1810
>
3500 - Local Oversight Program
>
PR0545280
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2020 1:10:42 PM
Creation date
2/3/2020 11:54:53 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545280
PE
3526
FACILITY_ID
FA0003954
FACILITY_NAME
SJ CO PUBLIC WORKS CORP YARD*
STREET_NUMBER
1810
Direction
E
STREET_NAME
HAZELTON
STREET_TYPE
AVE
City
STOCKTON
Zip
95205
APN
15518002
CURRENT_STATUS
02
SITE_LOCATION
1810 E HAZELTON AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 4 of 5 <br /> 4.4.2 AirSparginq Test <br /> To evaluate air sparging as a groundwater remediation alternative, a 4-hour air sparging test will <br /> be conducted on the air sparge well (AS-1). The air sparge test will be used to evaluate: <br /> • The air injection pressure and flow rate for engineering design requirements; <br /> • Radius of influence; <br /> • Any increase in dissolved oxygen readings in the test well and ulrservabon wells, <br /> • Off-gassingfvolatil ization of petroleum hydrocarbons from the vadosefsaturated zones; <br /> • Evidence of biodegradation. <br /> Prior to starting the AS test, groundwater table elevation and dissolved oxygen in groundwater will <br /> be monitored with field instruments in MWA, MW-2, MW-3, the proposed well to the west of the <br /> former UST#3, and SVEAC. In addition, observation well pressure, and soil gas parameters <br /> (oxygen, carbon dioxide, methane, and organic vapors)will be monitored w th field instruments in <br /> MW-1, MW-2, MW-3, the proposed well to the west of the former UST#3, SVE-1A/B/C, and SVE- <br /> 26 <br /> The AS test equipment will include an oil-less air compressor, air-hoses, flow gauges and multiple <br /> pressure gauges connected to air-tight well caps. During the tests, air from the compressor will <br /> be injected into the air sparge test well, and pressure readings will be collected from the test well <br /> and the observation wells (MW-1, MW-2, MW-3, the proposed well to the west of the former UST <br /> #3, SVE-1ABIC, and SVE-26). <br /> The test well and observation wells will be monitored with field instruments every 30 minutes <br /> during the 4-hour AS test. The monitoring parameters will include the water table elevation, air <br /> injection pressure, operating pressure, injected airflow rate, observation well pressure, dissolved <br /> oxygen in groundwater, and the soil gas parameters (oxygen, carbon dioxide, and organic <br /> vapors). Thirty minutes after the completion of the 4-hour test,the final monitoring parameters will <br /> be measured. <br /> Bill A. Cook III, P. G., C. E. G. <br /> CWEA certified Environmental Compliance Inspector <br /> Associate Geologist <br /> bcook@condorearth.com <br /> Condor Earth Technologies, Inc. <br /> 188 Frank West Cr. Suite I <br /> Stockton, CA 95206 <br /> Phone: (209) 234-0518 <br /> Fax: (209) 234-0538 <br /> Company Website: www.condorearth.com <br /> Condor GIS Services: www.condordataserver.com <br /> Map and Dairy Services: htto://www.ondormai)s.com/mwisp/ <br /> 6/1/2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.