Laserfiche WebLink
RAMAGE <br /> ENV IRON MENTAL,INC. <br /> OCT j 9 465 S.Meadows Pkwy,Ste.20 PMB 157 <br /> 2009 Reno, NV 89521 <br /> ENVIRIIIVWIENT Tel V75)851-7239 <br /> PERMITjSER ICE3T y Fax(775)851 7240 <br /> October 15, 2009 <br /> Mr. Harlin Knoll, Sr. R.E.H.S. <br /> San Joaquin County PHS/EHD <br /> 600 East Main Street <br /> Stockton,CA 95202-3029 <br /> Re: Quarterly Status Report,Third Quarter 2009 <br /> County Motor Pool UST Site, 1810 E. Hazelton Ave., Stockton, California <br /> Global ID#T0607799494,EHD Site Code: #1141,USTCF Claim#11390 <br /> Dear Mr. Knoll: <br /> On behalf of the county of San Joaquin (property owner), Ramage Environmental, Inc. is pleased to <br /> submit to the San Joaquin County Environmental Health Department(EHD)this Quarterly Status <br /> Report, Third Quarter 2009 for the above-referenced case. <br /> Proiect Status <br /> On March 7, 2003, Ramage Environmental published Site Conceptual Model and Work Plan, <br /> Additional Site Investigation and Remedial Feasibility Testing. On July 14, 2003, EHD approved the <br /> work plan. <br /> On May 20, 2005, Ramage Environmental published Well Installation and Groundwater Monitoring <br /> Report,which documented the installation of one additional groundwater monitoring well (MW-7) <br /> and two remedial feasibility test wells (SVE-IA/B/C and AS-1/SVE-2B). <br /> On April 9, 2009,EHD issued a letter documenting a case file review, and directed that the remedial <br /> feasibility testing be completed by August 1, 2009. Remedial feasibility testing and the investigation <br /> of the vertical extent of impacted soil and groundwater remain pending due to funding limitations. <br /> Work Completed During the Ouarter <br /> On July 24, 2009, EHD directed that quarterly groundwater monitoring be reduced to semi-annual <br /> sampling,according to State Water Resources Control Board (SWRCB) Resolution No. 2009-0042. <br /> As such, groundwater was not monitored or sampled during the third quarter of 2009. <br /> On July 28, 2009, Ramage Environmental notified EHD by e-mail that the remedial feasibility <br /> testing would not be completed by the deadline,due to continued funding limitations. <br /> No other environmental corrective actions were completed during the quarter. <br />