My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAZELTON
>
1810
>
3500 - Local Oversight Program
>
PR0545280
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2020 1:10:42 PM
Creation date
2/3/2020 11:54:53 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545280
PE
3526
FACILITY_ID
FA0003954
FACILITY_NAME
SJ CO PUBLIC WORKS CORP YARD*
STREET_NUMBER
1810
Direction
E
STREET_NAME
HAZELTON
STREET_TYPE
AVE
City
STOCKTON
Zip
95205
APN
15518002
CURRENT_STATUS
02
SITE_LOCATION
1810 E HAZELTON AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIRONMENTAL HEALTH�EPARTMENT <br /> SAN JOAQUIN COUNTY Unit Supervisors <br /> (40 <br /> Donna K.Heran,RE.H.S. Carl ggi man,R.E.H.S. <br /> Director 304 East Weber Avenue, Third Floor g Mike Huggins,R.E.H.S.,R.D.I. <br /> AI Olsen,RE.H.S. Stockton, California 95202-2708 Douglas W.Wilson,R.E.H.S. <br /> Program Manager Tele hone: (209) 468-3420 Margaret Lagorio,R.E.H.S. <br /> Laurie A.Cotulla,RE.H.S. 11 Robert McClellon,R.E.H.S. <br /> Program Manager Fax: (209) 464-0138 Mark Barcellos,R.E.H.S. <br /> CRAIG OGATA <br /> DIRECTOR OF FACILITIES MANAGEMENT <br /> SAN JOAQUIN COUNTY <br /> 212 N SAN JOAQUIN STREET SUITE A <br /> STOCKTON CA 95202 <br /> RE: 1810 E.Hazelton Ave., Stockton Site Code: 1141 <br /> WORK PLAN: Addition Site Assessment and Remedial Feasibility Testing <br /> DATED: March 7.2003 <br /> PREPARED BY:Ramage Environmental <br /> APPROVED: [X] <br /> DISHED: E )] <br /> ADDENDUM NEEDED: Submit by: <br /> ADEQUATE AND NECESSARY ELEMENTS OF THE WORK PLAN[H&S 25299.37,subd(c)(3)]: <br /> 1. To install 3 monitoring wells to define the lateral extent of ground water contamination. To collect soil <br /> samples and ground water samples for analyses of gasoline fuel constituents including fuel oxygenates <br /> and 1,2-DCA. <br /> 2. To install one nested vapor extraction well and one nested air sparge/vapor extraction well. <br /> 3. To collect soil samples from the vapor and air sparge wells for analyses. <br /> 4. To conduct an 8 hour vapor extraction pilot test and a four hour air sparge pilot test. The pilot test will <br /> be conducted using the proposed wells and existing wells. <br /> 5. Prior to remedial testing,a ground water baseline will be established using samples collected from <br /> MW 1,MW2 and from the proposed deep extraction well. <br /> 6. A corrective action report will be completed and submitted which will include the results from the <br /> additional investigation and remedial feasibility testing. <br /> 7. To continue with quarterly ground water monitoring and sampling. To continue with Quarterly <br /> Reporting to EHD and CVRWQCB. <br /> COMMENTS AND CONDITIONS: <br /> 1. The vertical extent of soil and ground water contamination need to be defined. <br /> The"Tri-Regional Board Staff Recommendations For Preliminary Evaluation and Investigation of Underground <br /> Tank Sites"along with its"Appendix A"and"Appendix B"should be used as guidance documents. All work and <br /> reports which require geological or engineering evaluation must be performed under the direction of an appropriate <br /> California registered or certified professional. <br /> DATE U BYM�`'I <br /> Harlin Knoll, Senior REHS(209)468-3442 <br />
The URL can be used to link to this page
Your browser does not support the video tag.