Laserfiche WebLink
r <br /> two <br /> RAMAGE <br /> ENVIRONMENTAL Sacramento Office <br /> Post Office Box 869 <br /> Rancho Murieta, CA 95683 <br /> Tel (916) 354-3250 <br /> Fax (916) 354-1786 ���1 <br /> July 16, 2001 u — - '7! ; iI) <br /> JUL 1 8 2001 <br /> E PEiRMIT IEiV I HEALTH <br /> Mr. Harlin Knoll, Sr. R.E.H.S. ISERViCES <br /> San Joaquin County PHS/EHD <br /> 304 East Weber Avenue, 3rd Floor <br /> Stockton, CA 95201-0388 <br /> Re: Letter Work Plan —Monitoring Well Installation and Groundwater Sampling <br /> San Joaquin County Motor Pool, 1810 E. Hazelton Avenue, Stockton, California <br /> PHS/EHD Site Code: 1141 <br /> Dear Mr. Knoll: <br /> On July 6, 2001, it was a pleasure to meet with you and Ms. Kerry Wasson of the San <br /> Joaquin County Facilities Management Department to review the above-referenced <br /> project. Based on our review of the project data and tour of the site vicinity, we agreed to <br /> disregard Work Plan, Additional Site Assessment submitted on March 16, 2001 by Tait <br /> Environmental Management, Inc. (Tait). Instead we decided that one groundwater <br /> monitoring well should be installed between the site and an operating city of Stockton <br /> water supply well, and that groundwater samples should be collected for analysis from <br /> the monitoring well network and the city of Stockton well. This letter outlines the <br /> methods and procedures for implementing these proposed tasks. <br /> SCOPE OF WORK <br /> Monitoring Well Installation, Development and Elevation Survev <br /> To determine the groundwater gradient and flow direction, and to evaluate the extent of <br /> impacted groundwater toward the operating city of Stockton well, one groundwater <br /> monitoring well will be installed, developed and surveyed(Site Plan attached). <br /> The well will be installed in 8-inch diameter soil boring drilled by a truck-mounted drill <br /> rig, equipped with hollow stem augers. It will consist of approximately 20 feet of two- <br /> inch diameter, Schedule 40, flush-threaded and machine-slotted(0.020-inch)PVC well <br /> screen. Since groundwater was previously encountered at approximately 45 feet bgs,the <br /> well will be drilled to a total depth of approximately 55 feet, and constructed with a <br /> screen interval of approximately 35 to 55 feet bgs. Blank PVC casing will thread into the <br /> top of the well screen and extend to the surface. <br />