My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0003515
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAZELTON
>
1810
>
3500 - Local Oversight Program
>
PR0545280
>
ARCHIVED REPORTS_XR0003515
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2020 6:13:39 PM
Creation date
2/3/2020 12:00:34 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0003515
RECORD_ID
PR0545280
PE
3526
FACILITY_ID
FA0003954
FACILITY_NAME
SJ CO PUBLIC WORKS CORP YARD*
STREET_NUMBER
1810
Direction
E
STREET_NAME
HAZELTON
STREET_TYPE
AVE
City
STOCKTON
Zip
95205
APN
15518002
CURRENT_STATUS
02
SITE_LOCATION
1810 E HAZELTON AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> 4.0 CONCLUSIONS, RECOMMENDATIONS AND PROJECT STATUS <br /> Between November 26, 2002 and March 7, 2003, the groundwater surface rose an average of <br />' 1 17 feet, the groundwater flow direction shifted approximately 10 degrees toward the southwest, <br /> and the gradient decreased from 0 0041 to 0 0020 foot/foot The groundwater flow direction and <br /> gradient have remained relatively consistent over the past three quarters <br /> Between November 26, 2002 and March 7, 2003, the concentrations of gasoline compounds in <br />' MW-2 declined, and only TPH-as-gasoline re-appeared in MW-3 at a low concentration of 55 µg/l <br /> As shown on the isoconcentration map for MTBE in groundwater (Figure 5), the lateral extent of <br /> MTBE at the water table is undefined to the south, west and east of the former UST <br /> Between November 26, 2002 and March 7, 2003, the free product thickness in MW-1 increased <br /> from 0 22 to 0 45 feet Between March 7, and May 19, 2003, after 11 weekly free product removal <br /> events, a total of 39 0 ounces of free product were removed, and the free product thickness was <br /> reduced to a non-measurable sheen <br /> I <br /> On March 7, 2003, Ramage Environmental submitted to EHD, a site conceptual model and work <br /> plan, which proposed additional site investigation and remedial feasibility testing tasks Currently, <br /> implementation of the proposed scope of work is pending regulatory approval of the work plan <br /> Ramage Environmental recommends that the proposed scope of work be completed, upon <br /> regulatory approval of the work plan In addition, based on the reduction of free product in MW-1, <br /> Ramage Environmental recommends that the free product removal events be reduced from <br /> weekly to monthly This revised free product removal schedule will be initiated in June 2003 <br /> 7 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.