Laserfiche WebLink
r <br /> Consistent with previous quarterly analytical results, thesam roundwater les collected from MW- <br /> 9 p <br /> 2, MW-4 and MW-6 contained dissolved concentrations of gasoline compounds The only lead <br /> scavenger compound (1,2-DCA and EDB) detected was 0 6 micrograms per liter (pg/1) of EDB in <br /> MW-6 The groundwater analytical results are summarized in Table 2, the distributions of TPH- <br /> as-gasoline, benzene and MTBE in groundwater are shown on separate isoconcentration maps <br /> (Figures 5, 6, and 7), and the laboratory reports are included in Appendix A <br /> 23 Free Product Removal <br /> On March 7, 2003, Ramage Environmental installed a Hydro-Skimmeffm passive free product <br /> skimmer in MW-1 The passive skimmer is four-inch diameter and 64-inches long, with a 10-inch <br />' recovery zone <br /> Between March 7, 2003 and March 15, 2006, after 45 site visits, approximately 220 94 ounces of <br /> accumulated free product have been removed from the skimmer During the first quarter of 2006, <br /> between January 9, and March 15, 2006, a total of 0 06 ounces of free product were removed in <br />' three monthly removal events, and the free product thickness ranged from a sheen to 0 02-foot <br /> All of the free product removal events are summarized in Table 3 <br /> r• <br /> r <br /> r <br /> r <br /> r <br /> r <br /> r <br /> r <br /> r <br />