Laserfiche WebLink
so-ire: h etl Re ,kvc f,o✓, Ref,-yf <br /> TABLE 1 <br /> Well Construction and Destruction Details <br /> Former 76(Former BP)Service Station No. 11195 <br /> 16500 Harlan Rd. Lathrop,CA <br /> Borehole Casing Screened Filter Pack Bentonite Seal Cement Seal <br /> Construction TOC Elevation Boring Depth Casing Slot Size <br /> Well I.D. Date (feet above msl) (feet bgs) Diameter Diameter Material (Inches) Interval Interval Interval Interval Location Well Destruction Methods <br /> (inches) (inches) (feet bgs) (feet bgs) (feet bgs) (feet bgs) <br /> Groundwater Monitoring Wells <br /> MW-1 12/11/92 14.19 23.0 7 2 PVC 0.02 8-23 6-23 4-6 0-4 On Site Pressure Grout <br /> MW-2 12/11/92 13.49 23.0 7 2 PVC 0.02 8-23 6-23 4-6 0-4 On Site Overdrill <br /> MW-3 12/11/92 14.08 24.5 7 2 PVC 0.02 8-23 6-24.5 4-6 0-4 On Site Pressure Grout <br /> MW-4 12/10/92 14.10 24.5 7 2 PVC 0.02 9.5-24.5 7.5-24.5 5.5-7.5 0-5.5 On Site Pressure Grout <br /> MW-5 12/10/92 15.08 24.5 7 2 PVC 0.02 9.5-24.5 7.5-24.5 5.5-7.5 0-5.5 On Site Overdrill <br /> MW-6 09/08/93 12.66 20.0 8 2 PVC 0.02 7-20 6-20 5-6 0-5 On Site Overdrill <br /> MW-7 9/8/1993 14.27 20.0 8 2 PVC 0.02 7-20 6-20 5.6 0-5 - Previously Destroyed <br /> MW-8 08/12/98 13.30 16.5 8 2 PVC 0.01 4-14 3-16.5 2.5-3 0-2.5 Off Site PVC Extraction <br /> MW-9 08/12/98 12.98 15.0 8 2 PVC 0.01 5-15 4-15 None 0-4 Off Site PVC Extraction <br /> MW-10 08/12/98 11.32 16.5 8 2 PVC 0.01 4-14 3-16.5 2.5-3 0-2.5 On Site PVC Extraction <br /> MW-11 08/12/98 11.72 16.5 8 2 PVC 0.01 4-14 3-16.5 2.5-3 0-2.5 Off Site Pressure Grout <br /> MW-12 08/12/98 12.72 16.5 8 2 PVC 0.01 4-14 3-16.5 2.5-3 0.2.5 Off Site Overdrill <br /> MW-13 05/29/02 15.23 21.0 8 2 PVC 0.02 6-20.5 5-21 3-5 0-3 Off Site PVC Extraction <br /> MW-14 05/29/02 14.29 21.0 8 2 PVC 0.02 5-20.5 4.5-21 3-4.5 0-3 Off Site PVC Extraction <br /> MW-15 05/28/02 14.64 21.0 8 2 PVC 0.02 5-20.5 4-21 2-4 0-2 Off Site PVC Extraction <br /> MW-16 05/28/02 15.60 21.5 8 2 PVC 0.02 5-19.5 4-21.5 2-4 0-2 Off Site PVC Extraction <br /> MW-17 05/28/02 13.50 20.0 8 2 PVC 0.02 5-19.5 4-20 2-4 0-2 Off Site PVC Extraction <br /> MW-18 12/10/02 12.13 20.0 8 2 PVC 0.02 5-19.5 4.5-20 3.5-4.5 1-3.5 Off Site PVC Extraction <br /> MW-19 12/10/02 12.86 20.0 8 2 PVC 0.02 5-19.5 4-20 3-4 1-3 Off Site PVC Extraction <br /> MW-20 12/10/02 12.47 20.0 8 2 PVC 0.02 5-19.5 4-20 3-4 1-3 Off Site Pressure Grout <br /> MW-21 12/10/02 11.97 20.0 8 2 PVC 0.02 5-19.5 4-20 3-4 1-3 Off Site Pressure Grout <br /> MW-22 08/26/05 12.26 22.5 8 2 PVC 0.02 7-22 5-22 3-5 1-3 Off Site Pressure Grout <br /> MW-23 05/19/05 10.98 22.5 8 2 PVC 0.02 7-22 5-22 3-5 1-3 Off Site PVC Extraction <br /> MW-24 05/19/05 11.84 22.5 8 2 PVC 0.02 7-22 5-22 3-5 1-3 Off Site Pressure Grout <br /> CC-WS 12/1998 14.20 11.5 NA 6 PVC 0.02 NA NA NA NA On Site Overdrill <br /> Remediation Wells <br /> VP-1 1/27/2011 NA 5.3 12 0.125 PVC NA NA 3-5.3 3-1.5 1.5-1.0 On Site Overdrill <br /> VP-2 1/27/2011 NA 5.4 12 0.125 PVC NA NA 3-5.4 3.1.5 1.5-1.0 On Site Overdrill <br /> VP-3 1/27/2011 NA 5.5 12 0.125 PVC NA NA 3-5.5 3-1.5 1.5-1.0 On Site Overdrill <br /> Well Construction and Destruction Details 1 of 2 ATC Project Number 52.75118.1751 <br />