Laserfiche WebLink
r <br /> s <br /> SITE HEALTH Sc SAFETY PLAN <br /> 1. 0 INTRODUCTION <br /> A. OVERVIEW <br /> This Project Health & Safety Plan delineates the basic <br /> safety requirements for this project. <br /> This project includes the scope of work for removal <br /> and/or installation as described on the cover sheet of <br /> this Project Health & Safety Plan. During the tank <br /> removal project, soils from beneath the tanks will be <br /> sampled for possible contamination. The soil samples <br /> will be collected and analyzed for the possible presence <br /> of migrating contaminants, including: TFHC (Total Fuel <br /> Hydrocarbons) and BTX Compounds (Benzene, Toluene, and <br /> .Xylenes) . <br /> At the beginning of the project, ambient air samples <br /> (background) will be taken with a Gastech LEL meter, set <br /> for reading ppm range, to determine the presence or <br /> absence of contamination. As the project continues <br /> ;during the day, the personnel on site shall draw <br /> periodic air samples to determine the possibility of <br /> increases in airborne contamination. <br /> The provisions set forth in this plan will apply as <br /> minimum rules to be followed by the employees of Walton <br /> Engineering, Inc. , the Environmental Consultant Company <br /> (listed on the cover sheet of this Project Health & <br /> Safety Plan, and herein referred to as "Environmental <br /> Consultant") and their subcontractors working on this <br /> phase of the project. The subcontractors may elect to <br /> modify these provisions, but only to upgrade or increase <br /> the safety requirements, and only with the concurrence <br /> of Walton Engineering, Inc. . <br /> 1 <br /> - — r <br />