My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
16500
>
3500 - Local Oversight Program
>
PR0545275
>
WORK PLANS_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2020 2:01:36 PM
Creation date
2/3/2020 12:24:01 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
FileName_PostFix
FILE 1
RECORD_ID
PR0545275
PE
3528
FACILITY_ID
FA0005678
FACILITY_NAME
LATHROP SHELL
STREET_NUMBER
16500
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
LATHROP
Zip
95330
CURRENT_STATUS
02
SITE_LOCATION
16500 S HARLAN RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> s <br /> SITE HEALTH Sc SAFETY PLAN <br /> 1. 0 INTRODUCTION <br /> A. OVERVIEW <br /> This Project Health & Safety Plan delineates the basic <br /> safety requirements for this project. <br /> This project includes the scope of work for removal <br /> and/or installation as described on the cover sheet of <br /> this Project Health & Safety Plan. During the tank <br /> removal project, soils from beneath the tanks will be <br /> sampled for possible contamination. The soil samples <br /> will be collected and analyzed for the possible presence <br /> of migrating contaminants, including: TFHC (Total Fuel <br /> Hydrocarbons) and BTX Compounds (Benzene, Toluene, and <br /> .Xylenes) . <br /> At the beginning of the project, ambient air samples <br /> (background) will be taken with a Gastech LEL meter, set <br /> for reading ppm range, to determine the presence or <br /> absence of contamination. As the project continues <br /> ;during the day, the personnel on site shall draw <br /> periodic air samples to determine the possibility of <br /> increases in airborne contamination. <br /> The provisions set forth in this plan will apply as <br /> minimum rules to be followed by the employees of Walton <br /> Engineering, Inc. , the Environmental Consultant Company <br /> (listed on the cover sheet of this Project Health & <br /> Safety Plan, and herein referred to as "Environmental <br /> Consultant") and their subcontractors working on this <br /> phase of the project. The subcontractors may elect to <br /> modify these provisions, but only to upgrade or increase <br /> the safety requirements, and only with the concurrence <br /> of Walton Engineering, Inc. . <br /> 1 <br /> - — r <br />
The URL can be used to link to this page
Your browser does not support the video tag.