My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
16500
>
3500 - Local Oversight Program
>
PR0545275
>
WORK PLANS_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2020 2:01:36 PM
Creation date
2/3/2020 12:24:01 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
FileName_PostFix
FILE 1
RECORD_ID
PR0545275
PE
3528
FACILITY_ID
FA0005678
FACILITY_NAME
LATHROP SHELL
STREET_NUMBER
16500
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
LATHROP
Zip
95330
CURRENT_STATUS
02
SITE_LOCATION
16500 S HARLAN RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BITE HEALTH SAFETY PLAN <br /> 8. 0 DECONTAMINATION PROCEDURES <br /> A. INTRODUCTION <br /> As part of the system to prevent or reduce the physical <br /> transfer of contaminants by people and/or equipment from <br /> on-site, procedures will be instituted for the proper <br /> decontamination of anything leaving the Exclusion Area <br /> and Contamination Reduction Area. These procedures <br /> include the decontamination of personnel, protective <br /> equipment, monitoring equipment, clean-up equipment, <br /> etc. Unless otherwise demonstrated, everything leaving <br /> the Exclusion Area should be considered contaminated and <br /> appropriate methods established for decontamination <br /> shall be followed. In general, decontamination at the <br /> site consists of rinsing of equipment, personnel, etc. , <br /> with some amounts of water and washing with detergent <br /> water solutions <br /> B. PROCEDURE <br /> 1. Personnel equipment worn into the Exclusion Area <br /> will be decontaminated upon leaving the <br /> Contamination Reduction Area. All equipment <br /> decontaminated will be air dried. j <br /> 2 . The decontamination of equipment, material, and <br /> personnel used or working in the Contamination <br /> Reduction Area may be somewhat less complex than <br /> that used in the Exclusion Area. <br /> 3 . The spent solution, brushes, sponges, containers, <br /> stands, etc. , used in the decontamination process <br /> must, until shown otherwise, be considered <br /> contaminated and must be properly disposed. <br /> I <br /> j <br /> 11 <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.