My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
16500
>
3500 - Local Oversight Program
>
PR0545275
>
WORK PLANS_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2020 2:01:36 PM
Creation date
2/3/2020 12:24:01 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
FileName_PostFix
FILE 1
RECORD_ID
PR0545275
PE
3528
FACILITY_ID
FA0005678
FACILITY_NAME
LATHROP SHELL
STREET_NUMBER
16500
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
LATHROP
Zip
95330
CURRENT_STATUS
02
SITE_LOCATION
16500 S HARLAN RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SITE HEALTH & SAFETY PLAN <br /> I. No excessive facial hair which interferes with a <br /> satisfactory fit of the facepiece-to-face seal, will be <br /> allowed on personnel required to wear respiratory <br /> protective equipment. <br /> J. All respiratory protection selection, use, and <br /> maintenance shall meet the requirements of established <br /> procedures, recognized consensus standards (AIHA, ANSI, <br /> NIOSH) , and shall comply with the requirements set forth <br /> in 29 CFR 1910. 134 . <br /> K. Appropriate work areas for support, contamination <br /> reduction, and exclusion will be. established. <br /> L. Walton Engineering, Inc. personnel on-site are to be <br /> thoroughly briefed on the anticipated hazards, equipment <br /> requirements, safety practices, emergency procedures and <br /> communications methods, initially and in daily <br /> briefings. <br /> M. Contact with surface and groundwater shall be minimized. <br /> N. Boots will be worn on-site at all times. <br /> In addition, the following precautions shall be <br /> implemented for all personnel working on the project <br /> site: <br /> Gross decontamination and removal of all personal <br /> protective equipment shall be performed prior to exiting <br /> the facility. Contaminated clothing will be removed and <br /> collected in a drum for disposal. <br /> The Project Superintendent will be responsible to take <br /> necessary steps to ensure that employees are protected <br /> from physical hazards, which could include, <br /> * Falling objects such as tools or equipment <br /> * Tripping over hoses, pipes, tools, or equipment <br /> * Slipping on wet or oily surfaces <br /> * Insufficient or faulty protective equipment <br /> * Insufficient or faulty operations, equipment, or <br /> tools <br /> 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.