My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
16500
>
3500 - Local Oversight Program
>
PR0545275
>
WORK PLANS_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2020 2:01:36 PM
Creation date
2/3/2020 12:24:01 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
FileName_PostFix
FILE 1
RECORD_ID
PR0545275
PE
3528
FACILITY_ID
FA0005678
FACILITY_NAME
LATHROP SHELL
STREET_NUMBER
16500
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
LATHROP
Zip
95330
CURRENT_STATUS
02
SITE_LOCATION
16500 S HARLAN RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
..' ,..' <br /> SITE HEALTH is SAFETY PLAN <br /> 2 . Actions to be taken will be dictated by the <br /> emergency condition. <br /> 3 . Power equipment will be shut down and operators will <br /> stand by for instruction. <br /> 4 . Injured personnel will be transported to the <br /> Contamination Reduction Line. <br /> 5 . In case of a fire, explosion, or hazard alarm, <br /> personnel will immediately proceed to assigned pre- <br /> arranged safe locations. <br /> 6. Upon arrival at the safe locations, a complete head <br /> count will be given to the Project Safety Officer <br /> and the Project Superintendent and personnel will <br /> stay at the safe locations until the area is <br /> secured. <br /> D. PERSONAL INJURY <br /> If an injury occurs due to an accident or exposure to a <br /> hazardous substance, Walton Engineering, Inc. will be <br /> notified. The Project Superintendent will be given all <br /> appropriate information concerning the nature and cause <br /> of the injury so that treatment preparations can be <br /> initiated. The injured person will be transported to <br /> the Contamination Reduction line where appropriate first <br /> aid and treatment can begin. The Project Superintendent <br /> will be informed and will investigate the cause of the <br /> injury and make any necessary changes in work <br /> procedures. <br /> E. AMBIENT MONITORING CONTINGENCIES <br /> When ambient monitoring on the downwind edge of the site <br /> indicates significantly higher than background levels <br /> of any contaminants, the Project Safety officer and <br /> Project Superintendent will immediately determine the <br /> cause, make changes to work practices or procedures, and <br /> if necessary, make changes in site layout and warn <br /> unprotected personnel to evacuate or don protective <br /> equipment. <br /> In the event of an accident resulting in physical <br /> injury, first aid will be administered; and the injured <br /> worker will be transported to the nearest hospital for <br /> emergency treatment. <br /> 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.