Laserfiche WebLink
N <br /> MW-7 <br /> INACCESSIBLE <br /> 0 20 40 <br /> SCALE IN FEET <br /> LOUISE AVENUE <br /> MW-4 -- <br /> (4.59) <br /> _f}4x.60 `� <br /> PLANTER <br /> UNDEFUEL TANKS <br /> 4.62 <br /> FUEL TANKS / �((�J( I`JI \ <br /> MW-3 <br /> (4.64) <br /> <4.64 MW-6 <br /> (461 ) �� (4.61 ) <br /> Q MW-2 <br /> UNDE <br /> UNDERGROUND c.�J DISPENSER (4.62) <br /> USED OIL TANK m 4.60 LAND <br /> MW-1 <br /> (4.58) <br /> DIRT LOT <br /> �Q <br /> LEGEND <br /> 0 GROUNDWATER MONITORING WELL <br /> (4.59) GROUNDWATER ELEVATION IN FIGURE 2 <br /> FEET ABOVE MEAN SEA LEVEL <br /> i 4.60 - GROUNDWATER ELEVATION POTENTIOMETRIC GROUNDWATER <br /> CONTOUR IN FEET ABOVE ELEVATION CONTOUR MAP <br /> MEAN SEA LEVEL <br /> CONTOUR INTERVAL-0.02 FOOT) AUGUST 31 , 1995 <br /> CALCULATED GROUNDWATER BP OIL SERVICE STATION NO. 11195 <br /> 0.001 GRADIENT DIRECTION AND 16500 SOUTH INTERSTATE 1-5 <br /> MAGNITUDE IN FOOT PER FOOT <br /> LATHROP, CALIFORNIA <br /> PROJECT NO. 10-151 <br /> �ALISTO ENGINEERING GROUP <br /> WALNUT CREEK. CALIFORMA <br /> s <br />