Laserfiche WebLink
"6,N <br /> TABLE 1-SUMMARY OF RESULTS OF GROUNDWATER SAMPLING <br /> BP OIL COMPANY SERVICE STATION NO.11195 <br /> 16500 SOUTH INTERSTATE 1-5,LATHROP,CALIFORNIA <br /> AL ISTO PROJECT NO.10-151 <br /> WELL DATE OF CASING DEPTH TO GROUNDWATER TPH-G TPH-D B T E X TOG WVOCs DO LAB <br /> ID SAMPLING/ ELEVATION {a) WATER ELEVATION (b) (ppb) (ppb) (ppb) (ppb) (ppb) (ppb) (ppb) (ppb) (ppm) <br /> MONITORING (Feet) (Feet) (Fee1) <br /> MW-1 12/21/92 14.39 11.16 3.21 ND<50 - ND<0.5 ND<0.5 ND<0.5 ND<0.5 PACE <br /> MW-1 05/17/93 14.39 8.41 5-98 ND<50 - ND<0.5 ND<0.5 0.6 2.1 - - - PACE <br /> MW-1 09/15/93 14.39 9.78 4.61 ND<50 - ND<0.5 ND<0.5 ND<0.5 ND<0.5 - - PACE <br /> MW-1 01/12/94 14.39 10.49 3.90 ND<50 - ND<0-5 ND<o.5 ND<0.5 ND<0.5 - 3,7 PACE <br /> MW-1 05/12/94 14.39 977 4.62 ND<50 - ND<0.5 ND<0.5 ND<0.5 ND<0.5 - 4.0 PACE <br /> MW-1 10/07/94 14,39 10.54 3.65 ND<50 - ND<0.5 ND<0,5 ND<0.5 ND<0.5 - - 3.9 PACE <br /> MW-2 12/21/92 14.20 10,96 3.24 ND<50 - ND<0.5 ND<0.5 ND<0.5 ND<0.5 - PACE <br /> MW-2 05/17193 1420 8.20 6.00 120 - 1.8 0.6 12 1 - - PACE <br /> MW-2 09/15/93 1420 9.58 4.62 2800 --- 97 ND<2.5 290 250 - PACE <br /> MW-2 01/12/94 1420 10.28 3.92 51 - ND<0.5 ND<0.5 ND<0.5 ND<o.5 - 4.3 PACE <br /> MW-2 05/12/94 1420 9.57 4.63 64 - ND<0.5 ND<0.5 ND<0.5 ND<0.5 -- - 3.9 PACE <br /> MW-2 10/07194 1420 10.36 3,84 86 - ND<0.5 ND<0.5 ND<0,5 ND<0.5 - - 4.0 PACE <br /> MW-3 12/21/92 15.10 11.84 3.26 1300 - 6.7 3.1 9.1 310 - - - PACE <br /> MW-3 05/17/93 15.10 9.05 6.05 3600 - 20 9.3 470 700 PACE <br /> QC-1 (c) 05/17/93 - - -- 4000 --- 23 12 520 810 - - - PACE <br /> MW-3 09/15/93 15.10 10.44 4.66 38000 - 770 34 1700 3300 --- - - PACE <br /> MW-3 01/12194 15.10 11.15 3.95 380 - ND<0.5 ND<0.5 ND<0.5 ND<0.5 - - 5.3 PACE <br /> OC-1 (a) 01/12/94 15.10 - - 400 --- ND<0.5 ND<0.5 ND<0.5 ND<0.5 - - - PACE <br /> MW-3 05112/94 15.10 10.45 4,65 160 - 0.7 ND<0.5 4.3 4.2 -- - 4.4 PACE <br /> OC-1 (c) 05/12/94 15.10 - - 170 - 0.7 ND<0.5 3.8 3.9 - - - PACE <br /> MW-3 10/07/94 15.10 11.21 3.69 120 - ND<0.5 ND<0.5 ND<0.5 ND<0.5 - - 4.3 PACE <br /> QC-1 (c) 10/07/94 15.10 - - ND<50 - 0.7 ND<0.5 ND<0.5 ND<0,5 - - - PACE <br /> MW-4 12/21/92 14,32 11.06 3.26 10000 ND<5 NDd.5 3.5 300 540 ND<50 ND (d) - PACE <br /> MW-4 05/17/93 14.32 6.25 6.07 6600 --- 7,7 3.3 840 1000 - - - PACE <br /> MW-4 09/15/93 14.32 9.644.68 16000 - ND<l2 ND<12 1000 1300 - PACE <br /> QC-1 (c) 09/15^93 - -- - 16000 - 18 ND<12 1000 1200 - - PACE <br /> 3 <br /> MW-4 01/12/94 14.32 10.36 ,94 3200 6.2 1.4 150 112 4.8 PACE <br /> MW-4 05/12/94 14.32 9.70 4.62 160 --- ND<0.5 2.5 0.7 ND<0.5 - - 5.0 PACE <br /> MW-4 10/07/94 14.32 10.46 3.86 13000 - 11 2,1 1100 33 --- - 4-8 PACE <br /> MW-5 12/21/92 16.00 12.74 3.26 ND<50 - ND<0.5 ND<0.5 ND<0.5 ND<0.5 - - - PACE <br /> MW-5 05/17/93 16.00 9.94 6.06 ND<50 110 ND<0.5 ND<0.5 ND<0.5 ND<1.0 ND<5.0 ND (d) --- PACE <br /> MW-5 09/15/93 16.00 11.31 4.69 ND<50 ND<50 ND<0,5 ND<0.5 ND<0.5 ND<0.5 - - - PACE <br /> MW-5 01/12/94 16.00 12.07 3.93 ND<50 80 ND<0,5 ND<0.5 ND<0,5 NO<0.5 ND<5000 NO (d) 4.5 PACE <br /> MW-5 05/12134 16.00 11.36 4.64 ND<50 80 ND<0.5 ND<0.5 ND<0.5 ND-0.5 ND<5000 ND (d) 4.5 PACE <br /> MW-5 10/07/94 16.00 12.15 3,85 ND<50 260 ND<0.5 ND<0.5 ND<0.5 ND<0,5 ND<5000 ND (d) 4,4 PACE <br /> 20-Jan-95 PAGE 1 <br />