My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0011599
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
16500
>
3500 - Local Oversight Program
>
PR0545275
>
ARCHIVED REPORTS_XR0011599
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2020 2:19:41 PM
Creation date
2/3/2020 12:47:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011599
RECORD_ID
PR0545275
PE
3528
FACILITY_ID
FA0005678
FACILITY_NAME
LATHROP SHELL
STREET_NUMBER
16500
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
LATHROP
Zip
95330
CURRENT_STATUS
02
SITE_LOCATION
16500 S HARLAN RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FIELD PROCEDURES <br /> FOR <br /> DRILLING AND SAMPLING <br /> AND GROUNDWATER MONITORING WELL INSTALLATION <br /> 1 <br /> Drilling Procedures <br /> The soil borings were drilled using 8-inch-diameter, continuous-flight, hollow-stem augers. <br /> To avoid cross-contamination, drilling equipment in contact with potentially-contaminated <br /> material was decontaminated by steam cleaning before and after each use. Decontamination <br /> fluids were placed into properly-labeled Department of Transportation approved drums for <br /> disposal. <br /> Soil Sampling Procedures <br /> During drilling, samples were collected beginning at 5 feet below grade and terminating at <br /> the total depth of each boring. Before and after each use, the sampler was washed using a <br /> phosphate-free detergent followed by tap water and deionized water rinses. Soil sampling <br /> was accomplished using aCalifornia-modified split-spoon sampler lined with appropriately- <br /> sized brass tubes. A 140-pound slide hammer falling 30 inches was used to advance the <br /> sampler 18 inches ahead of the hollow-stem augers into undisturbed soil, and blow counts <br /> were recorded for every 6 inches of penetration to evaluate the consistency of the soil. <br /> _ - After retrieval from the augers, the sampler was split, the sample tubes removed, and a soil <br /> sample was selected for possible chemical analysis. The sample was retained within the <br /> brass tube, and both ends were immediately covered with Teflon sheeting and polyurethane <br /> -:� caps. The caps were sealed with tape and labeled with the following information: Alisto <br /> :a Engineering project number, boring number, sample depth interval, sampler's initials, and <br /> date of collection. The soil sample was immediately placed in a waterproof plastic bag and <br /> stored in a cooler containing blue or dry ice. Possession of the soil samples was documented <br /> from the field to a state-certified analytical laboratory by using a chain of custody form. <br /> Soil samples and drill cuttings, when appropriate, were described by Alisto Engineering <br /> personnel using the Unified Soils Classification System, and field estimates of soil type, color, <br /> moisture, density, and consistency were noted on the boring logs. The logs were reviewed <br /> by a civil engineer registered in the State of California. <br /> Groundwater Monitoring Well Installation <br /> Construction of the groundwater monitoring wells was based on the stratigraphy in the soil <br /> <j borings. The well construction materials were introduced into the boring through the <br /> hollow-stem augers to centralize the well casing and minimize the possibility of native <br /> material entering the annular space of the well. <br /> The 2-inch-diameter polyvinyl chloride well casing consisted of 0.020-inch slotted casing from <br /> the bottom of the boring to a depth interval above the highest anticipated water level, and <br /> solid casing was installed from the top of the slotted casing to approximately 0.5 foot below <br /> grade to accommodate the utility box. The casings, fittings, screens, and other well <br /> l =- construction components were steam cleaned before installation. <br />
The URL can be used to link to this page
Your browser does not support the video tag.