Laserfiche WebLink
7 <br /> ALISTO ENGINEERING GROUP <br /> Groundwater Development and Sampling Form <br /> Client•. Date: <br /> Alisto Project No: " S Field Person e <br /> Service Station No: Address: <br /> Well ID: MW3Field Actiyiti: _—Well Development 1well. Sampling Product Bailing <br /> Casing Diameter: Purge Method: Well Data: <br /> '= 12 Inch (0.16 Gal/foot) Pump (dispos. Poly Tubing) Depth to Product <br /> 3 Inch (0.37 Gal/foot) _Disposable Bailers Product Thickness <br /> 4 Inch (0.65 Gal/Foot) _Other Depth to Water <br /> ==_ ,4.5 Inch (0.83 Gal/foot) ^1.66 PVC Standard Bailer <br /> =--� _6 Inch (1.47 Gal/foot) 3.50 PVC Standard Bailer <br /> Sampling Method: Decontamination Method: <br /> Disposable Bailer Triple Rinse (Liquinox) <br /> -_� Pump Steam Cleaned <br /> Calculated Purge Volume – <br /> ft X .� Lv Gal/Ft - 7 - <br /> 3 Gal X _ <br /> Total Depth Depth to Water Conversion Casing Vol Vols to Total <br /> of Well Water Column Factor Purge Volume <br /> Well Development/Sampling Parameters <br /> Time Temp pH Cond. Purge Comments/ Analysis Container Presery <br /> IF (umbos/ Vol Turbidity Required Type <br /> t: an) (Gal) <br /> u y TPH- VOA HCL <br /> G/BTEX <br /> TPH- Amber Solvent <br /> Diesel Liter Rinsed <br /> F-;i S ! 1 ,�3 3 EPA 601 VOA <br /> t 41 <br /> f`:�a l rr1 <br /> l 1 I y 55520 F r HxSO4 <br /> FORM:Fs3/121592 <br /> F.i <br />