My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0011599
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
16500
>
3500 - Local Oversight Program
>
PR0545275
>
ARCHIVED REPORTS_XR0011599
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2020 2:19:41 PM
Creation date
2/3/2020 12:47:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011599
RECORD_ID
PR0545275
PE
3528
FACILITY_ID
FA0005678
FACILITY_NAME
LATHROP SHELL
STREET_NUMBER
16500
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
LATHROP
Zip
95330
CURRENT_STATUS
02
SITE_LOCATION
16500 S HARLAN RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
l�� <br /> • i BP OIL � u i �4iiv a �fi �T BP Oil Company <br /> Cr�J7,F 16400 Southcenter Parkway,Suite 301 <br /> Tukwila,Washington 98188 <br /> 93 ,sh e Zit' �„{ �� 4 "0"575-4077 <br /> Environmental Health Division June 21 1993 <br /> Public Health Services <br /> San Joaquin County <br /> P.O.Box 2009 <br /> Stockton CA 95201 <br /> Dear Ms. Cotulla, <br /> RE : BP OIL # 11195, 16500 S I-5, Lathrop, CA <br /> Reference my letter dated April 23 1993 , I now submit the <br /> GROUNDWATER MONITORING AND SAMPLING REPORT dated June 1993. <br /> Groundwater sampling and report submittal for this site will <br /> continue on a quarterly basis until otherwise proposed. As <br /> anticipated in my letter the Work Plan to perform additional <br /> assessment activities, utilizing information from this sampling <br /> event, has been produced as a matter of course and is also <br /> attached for your review and authorisation. <br /> During a conversation with Mr. Michael Collins of your <br /> department on June 16 1993 , he requested a response to your <br /> letter dated March 25 1993 setting deadlines for report and Work <br /> Plan submittal. This letter was not received by BP Oil until <br /> faxed by Michael after our telephone conversation. As a result, <br /> the deadlines imposed could not be known. The use of certified <br /> mail may solve this problem in future. Since no correspondence <br /> setting due dates for report submittal was received by BP Oil <br /> until after they had passed I trust that you can agree with me <br /> that BP Oil could not now be considered to have been overdue with <br /> these documents. <br /> A review of BP Oil ' s self-imposed schedule for environmental <br /> assessment of this site is indicative of dedicated performance, <br /> and of consistent progress in performing the work necessary to <br /> comply with regulatory guidelines, in a proper and efficient <br /> manner . Please remember that the initial groundwater <br /> investigative activities were conducted to comply with BP Oil ' s <br /> internal policies, and was not the result of regulatory <br /> oversight. Furthermore, BP Oil 's schedule for the recent sampling <br /> report and work plan submittal for this site, without the benefit <br /> of your guidance, shows our commitment to timely environmental <br /> management of this site. <br />
The URL can be used to link to this page
Your browser does not support the video tag.