Laserfiche WebLink
N <br /> MW--7 <br /> INACCESSIBLE <br /> 0 20 40 <br /> SCALE IN F7 <br /> LOUISE AVENUE <br /> W-4 <br /> (4.62) <br /> r)x)/ PLANTER <br /> EF <br /> FUEL TANOKSN- ( J II <br /> �J�J <br /> MW-3 Mw-6 <br /> XUNDERGROUND <br /> Mw-5 <br /> (4.65) (4.61) <br /> (4.64) � MW-2 <br /> � lDSILANDER (4.63) <br /> ED OIL TANK <br /> (4.62) <br /> DIRT LOT <br /> �Q <br /> LEGEND FIGURE 2 <br /> 0 GROUNDWATER MONITORING WELL POTENTIOMETRIC GROUNDWATER <br /> (4.63) GROUNDWATER ELEVATION IN ELEVATION MAP <br /> FEET ABOVE MEAN SEA LEVEL <br /> MAY 12, 1994 <br /> BP OIL SERVICE STATION NO. 11195 <br /> 16500 SOUTH INTERSTATE 1-5 s <br /> LATHROP, CALIFORNIA Y <br /> PROJECT N0. 10-151 <br /> �ALISTO ENGINEERING GROUP <br /> WALNUT CREEK. CALIFORNIA <br /> O <br />