Laserfiche WebLink
N <br /> MW-7 <br /> INACCESSIBLE <br /> 0 20 40 <br /> SCALE IN FEET <br /> LOUISE AVENUE <br /> W-4 <br /> (3).70) <br /> PLANTER ` <br /> FUEL UNDERGROUND TANKS (J ,I II <br /> c�J �0 <br /> �-3 MW— <br /> w s <br /> (W7 � (3.68) <br /> XUNDERG,ROUND <br /> MW-5 -- <br /> (3 68) �4u 3.68� o�z�' 0 MW-2 <br /> `'or DISPENSER <br /> � �j Q ISLANDS (3.67) <br /> D OTANK m ,3.66 <br /> I <br /> MW-1 Q <br /> ` (3.64) <br /> DIRT LOT <br /> LEGEND FIGURE 2 <br /> 0 GROUNDWATER MONITORING WELL <br /> (3.70) GROUNDWATER ELEVATION IN POTENTIOMETRIC GROUNDWATER <br /> FEET ABOVE MEAN SEA LEVEL ELEVATION CONTOUR MAP <br /> or 3.70 — GROUNDWATER ELEVATION DECEMBER 8, 1994 <br /> CONTOUR IN FEET ABOVE <br /> MEAN SEA LEVEL BP OIL SERVICE STATION NO. 11195 <br /> CONTOUR INTERVAL-0.02 FOOT) 16500 SOUTH INTERSTATE 1-5 s <br /> CALCULATED GROUNDWATER LATHROP, CALIFORNIA <br /> 0.Q01 GRADIENT DIRECTION AND <br /> MAGNITUDE IN FOOT PER FOOT PROJECT NO. 10-151 <br /> �ALISTO ENGINEERING GROUP <br /> WALNUT CREEK• CALIFORNIA <br /> 0 <br />