Laserfiche WebLink
N <br /> MW-7 <br /> INACCESSIBLE <br /> ty:rr <br /> 0 20 40 <br /> SC&E IN FEET <br /> LOUISE AVENUE <br /> w-4 <br /> x(6.53) MW-3 <br /> f]I <br /> 1f� (6.51) PLANTER ` <br /> I <br /> UNDERGROUND <br /> FUEL TANKS <br /> / r <br /> 65 <br /> / , MW--6 <br /> /UNDERGROUND <br /> ro <br /> MW— <br /> (6 51) � � ��� � / (6.44) <br /> Lv r <br /> � � � MW-2 <br /> (6.44) <br /> ED OIL TANK <br /> SERVICE 1100, <br /> � r <br /> STATION <br /> ` 8UILUINIG MW-1 <br /> (6.45) DISPENSER OQ <br /> ISLANDS <br /> DIRT LOT <br /> �s <br /> z� <br /> LEGEND FIGURE 2 <br /> 4� GROUNDWATER MONITORING WELL POTENTIOMETRIC GROUNDWATER <br /> (6.45) FEET ABOVEE MEAN SEA LEVEL ELEVATION CONTOUR MAP <br /> i 6.46 GROUNDWATER ELEVATION JUNE 9, 1995 <br /> CONTOUR IN FEET ABOVE <br /> MEAN SEA LEVEL BP OIL SERVICE STATION NO. 11195 g <br /> (CONTOUR INTERVAL--0.02 FOOT) 16500 SOUTH INTERSTATE 1-5 <br /> CALCULATED GROUNDWATER L4THROP, CALIFORNIA <br /> `;I 0.001 GRADIENT DIRECTION AND PROJECT N0. 10-151 " <br /> -= MAGNITUDE IN FOOT PER FOOT <br /> �/�\ ALISTO ENGINEERING GROUP <br /> WALNUT CREEK, CALIFORNIA <br />