Laserfiche WebLink
L <br /> A TISTO Field Report 1 Sampling Data Sheet <br /> ENGINEERING Project No. 10-151-06-003 Date: 9 <br /> GROUP Address 16500 South 1-5 Day: M T Wfflj F <br /> 1575 TREAT BOULEVARD, SUITE 201 Contract No. H177183 city: Lathrop <br /> WALNUT CREEK CA 94598 510 295-1650 FAX 295-1823 Station No. BP 11195 <br /> DEPTH TO GROUNDWATER SUMMARY x <br /> WELL SAMPLE WELL TOTAL DEPTH TO PRODUCT TIME COMMENTS: <br /> ID ID DIAM DEPTH WATER THICKNESS MONITORE <br /> MW-1 3 21, �$- 4. T S �' /0 I vZ <br /> [j <br /> MW-2 TSE 2" Z2r80.24- 6-?3 �'' to v <br /> MW-3 s fo 2" -1,,18' 7, IC \(� -r -A r �. <br /> )A <br /> MW-4 2" -2-2-5T <br /> MW-6 2" S0) <br /> ` MW-7 S 211 -- kce5s C) (a w1i 10V <br /> pH METER <br /> FIELD INSTRUMENT CALIBRATION DA , <br /> r- ►bQ 4.00 7.00 10.00~ TEMPERATURE COMPENSATED r(Y) N TIME O O O WEATHER <br /> D.O. METER r +b Gt ZERO d.0. SOLUTION _ BAROMETRIC PRESSURE �Zbt) TEMP (2 <br /> CONDUCTIVITY METER_ r b 10,000 TURBIDITY METER 5.0 NTU OTHER <br /> LEAK DETECTOR : ALARM MODE NON ALARM MODE <br /> Well ID Depth to Watei Diam Cap/Lock Product Depi Iridescence Gal, Time Temp *i- pH E.C. D.0. 0 EPA 601 <br /> Y TPH-G/BTEX_ <br /> Total Depth-Water Level= x Well Vol.Factor= x# I.to Purge PurgeVol. Q s <br /> 1 1• e D,OL 0 TPH Diesel <br /> 19 .3 - -EL S Z = (1-1 x04 =2�2.r� . �, 4•i D3 t'� i '1 q O TOG 5520 <br /> Purge Method; ufface Pump ODisp.Tube OWlnch ODisp.Baller(s)_OSys Port TIME/SAMPLE ID <br /> Comments: S� <br /> PAGE OF <br />