Laserfiche WebLink
N <br /> ARCO <br /> rs ., SERVICE <br /> STATI 0 N <br /> a za ao <br /> MW-7 SCALE IN FEET <br /> INACCESSIBLE <br /> LOUISE AVENUE <br /> Ie lW_ <br /> (7.92)44 <br /> PLANTER ` <br /> UNDERGROUND— <br /> STORAGE <br /> NDERGROUND <br /> STORAGE TANKS <br /> � l J(X BMW-� 7 g0 MW-6 <br /> ! 0 <br /> 8.20� �o � <br /> (7.92) <br /> / o <br /> cr) / MW-5 ��a z o\ / <br /> (8,29) <br /> Q <br /> UNDERGROUND m PUMP M 88co ) <br /> USED OIL TANK ISLANDS <br /> .01 <br /> MW-1 <br /> DIRT LOT (7 92) <br /> �Q <br /> LEGEND FIGURE 2 <br /> 0 GROUNDWATER MONITORING WELL POTENTIOMETRIC GROUNDWATER <br /> (7.92) GROUNDWATER ELEVATION IN ELEVATION CONTOUR MAP <br /> FEET ABOVE MEAN SEA LEVEL <br /> 8.00 — GROUNDWATER ELEVATION MARCH 25, 1997 <br /> CONTOUR INFEET ABOVE BP OIL SERVICE STATION NO. 11195MEAN SEA LL <br /> g <br /> CONTOUR INTERVAL-0.10 FOOT) 16500 SOUTH INTERSTATE 5 ' <br /> CALCULATED GROUNDWATER LATHROP, CALIFORNIA <br /> 0.005 GRADIENT DIRECTION AND <br /> PROJECT NO. 10-151 <br /> MAGNITUDE IN FOOT PER FOOT <br /> 4 <br /> ALISTO ENGINEERING GROUP <br /> WALNUT GREEK, CALIFORNIA <br />