My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0011613
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
16500
>
3500 - Local Oversight Program
>
PR0545275
>
ARCHIVED REPORTS_XR0011613
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2020 2:52:09 PM
Creation date
2/3/2020 12:54:43 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011613
RECORD_ID
PR0545275
PE
3528
FACILITY_ID
FA0005678
FACILITY_NAME
LATHROP SHELL
STREET_NUMBER
16500
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
LATHROP
Zip
95330
CURRENT_STATUS
02
SITE_LOCATION
16500 S HARLAN RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ti <br /> ETTLER - YAN INC. <br /> September 10, 2001 <br /> G-R Job#180175 <br /> Mr. Edward C. Ralston <br /> Tosco Marketing Company <br /> 1380 Lead Hill Road, Suite 120 <br /> Roseville, California 95661 <br /> RE: Third Quarter Event of August 10,2001 <br /> Groundwater Monitoring & Sampling Report <br /> Tosco(Former BP Oil) Service Station#11195 <br /> 16500 South 1-5 <br /> Lathrop, California <br /> Dear Mr. Ralston: <br /> This report documents the most recent groundwater monitoring and sampling event performed by Gettler-Ryan Inc. <br /> (G-R) at the referenced site. All field work was conducted in accordance with G-R Standard Operating Procedure <br /> - Groundwater Sampling (attached). <br /> Static groundwater levels were measured and all wells were checked for the presence of separate-phase hydrocarbons. <br /> Separate-phase hydrocarbons were not present in the wells. A Potentiometric Map is included as Figure 1. Dissolved <br /> Oxygen Concentrations are presented in Table 3. Static water level data and groundwater elevations are summarized <br /> in Table 1. <br /> Groundwater samples were collected from the monitoring wells as specified by G-R Standard Operating Procedure <br /> -Groundwater Sampling(attached). The field data sheets are also attached. The samples were analyzed by Sequoia <br /> Analytical. Analytical results are summarized in Tables 1 and 2. A Concentration Map in included as Figure 2. The <br /> chain of custody document and laboratory analytical reports are also attached. <br /> Sincerely, <br /> Deanna L. Harding <br /> Project Coordinator S�ERE� C�O� <br /> No. 6882 <br /> Doug] s J. ee �r <br /> Senior Geologist,R.G. 6882 <br /> Figure 1: Potentiometric Map 9TFG� C' �E <br /> Figure 2: Concentration Map <br /> Table 1: Groundwater Monitoring Data and Analytical Results <br /> Table 2: Groundwater Analytical Results-Oxygenate Compounds <br /> Table 3: Dissolved Oxygen Concentrations <br /> Attachments: Standard Operating Procedure-Groundwater Sampling <br /> Field Data Sheets <br /> Chain of Custody Document and Laboratory Analytical Reports <br /> 6747 Sierra Court , Suite J • Dublin , California 94568 { 925 ) 551 - 7555 <br />
The URL can be used to link to this page
Your browser does not support the video tag.