Laserfiche WebLink
Remedial Status Report-Tosco (Former BP Oil)Station No. 11195 <br /> } August 28, 2000 <br /> the conductor casing. The recommended purging program is ongoing at this time. Based on <br /> future analytical results, additional wells may be substituted for those currently purged as <br /> conditions warrant. <br /> If you have any questions regarding this report, please call us in our Dublin office at (925) 551- <br /> 7555. <br /> Sincerely, <br /> Gettler-Ryan Inc. <br /> Clyde J. Galantine 'QO� <br /> Project Geologist <br /> No. 6882 <br /> Doug] s J. Lee <br /> Project Manager, R. G. No. 6882 F�F CAL�Fa <br /> Attachments: Table 1. - Groundwater Removal and Analytical Data <br /> Figure 1. Vicinity Map <br /> Figure 2. Site Plan <br /> Groundwater Sample Analytical Results <br /> cc: Mr. Michael J. Infurna Jr. - San Joaquin County Public Health Services <br /> s <br /> k <br /> 4 <br /> I`Fr4� <br /> . •� I 1 <br /> 140193.08 <br /> 3 <br /> s <br />