Laserfiche WebLink
. x <br /> BP WELL MOAiTOF„EG DATA SHEET <br /> -m Project C13 12 -Z Job # J� s <br /> Sampler: Date: 3 2,Z- 9 <br /> Well I.D.: ml,� G Well Diameter: (P 3 4 6 8 <br /> Total Well Depth: y 6/2 Depth to Water: <br /> Depth to Free Product: Thickness of Free Product (feet): <br /> Referenced to: PVC Grade D.O. Meter (if req'd): Ysr HACH <br /> Well Diameter Multiplier Well Diameter Multiplier <br /> 2” 0.16 5" 1.02 <br /> 3" 0.37 6" 1.47 <br /> 4" 0.65 Other radius•0.163 <br /> Purge Method: Rail Sampling Method: Bailer <br /> is osable Disposable Bailer( <br /> Middleburg Extraction Port <br /> Electric Submersible Other: <br /> Extraction Pump <br /> Other: (� <br /> X _ �• / Gals. <br /> 1 Case Volume Gals. Specified Volumes Calculated Volume <br /> Time Temp (°F) pH Cond. Turbidity Gals. Removed Observations <br /> lC? Sri - 550 S <br /> Did well dewater? Yes N Gallons actually evacuated: <br /> Sampling Time: 1 (s Sampling Date: 3 - 7 Z- 9 <br /> Sample LD.: u,� Laboratory: ( SPLOther <br /> Analyzed for: CTPH-G BTEC MTBE TPH-D Other: <br /> ME mgi <br /> D.O. (if req'd): Pre-puree: 1 Post-purge: LI <br /> 0.R. (if req'd}: Pre-purge: MV� Post-purge: mV <br />