My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0011642
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
16500
>
3500 - Local Oversight Program
>
PR0545275
>
ARCHIVED REPORTS_XR0011642
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2020 3:18:35 PM
Creation date
2/3/2020 1:06:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011642
RECORD_ID
PR0545275
PE
3528
FACILITY_ID
FA0005678
FACILITY_NAME
LATHROP SHELL
STREET_NUMBER
16500
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
LATHROP
Zip
95330
CURRENT_STATUS
02
SITE_LOCATION
16500 S HARLAN RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GETTLER-RYAN INC. <br /> FIELD METHODS AND PROCEDURES <br /> Site Safety Plan <br /> Field work performed by Gettler-Ryan Inc. (GR) is conducted in accordance with GR's Health and <br /> Safety Plan and the Site Safety Plan. GR personnel and subcontractors who perform work at the <br /> site are briefed on the of these plans contents prior to initiating site work. The GR geologist or <br /> engineer at the site when the work is performed acts as the Site Safety Officer. GR utilizes a <br /> photoionization detector(PID)to monitor ambient conditions as part of the Health and Safety Plan_ <br /> Collection of Soil Samples <br /> Exploratory soil borings are drilled by a California-licensed well driller. A GR geologist is present <br /> to observe the drilling, collect soil samples for description, physical testing, and chemical analysis, <br /> and prepare a log of the exploratory soil boring. Soil samples are collected from the exploratory <br /> soil boring with a split-barrel sampler or other appropriate sampling device fitted with clean brass <br /> or stainless steel liners. The sampling device is driven approximately 18 inches with a 140-pound <br /> hammer falling 30 inches. The number of blows required to advance the sampler each successive <br /> 6 inches is recorded on the boring log. The encountered soil is described using the Unified Soil <br /> Classification System(ASTM 2488-84) and the Munsell Soil Color Chart. <br /> After removal from the sampling device, soil samples for chemical analysis are covered on both <br /> ends with Teflon sheeting or aluminum foil, capped, labeled, and placed in a cooler with blue ice <br /> for preservation. A chain-of-custody form is initiated in the field and accompanies the selected soil <br /> samples to the analytical laboratory. Samples are selected for chemical analysis based on: <br /> a. depth relative to underground storage tanks and existing ground surface <br /> b. depth relative to known or suspected groundwater <br /> C. presence or absence of contaminant migration pathways <br /> d. presence or absence of discoloration or staining <br /> C. presence or absence of obvious gasoline hydrocarbon odors <br /> f. presence or absence of organic vapors detected by headspace analysis <br />
The URL can be used to link to this page
Your browser does not support the video tag.